Laserfiche WebLink
June 12, 2023 <br />Attn: Paul Palzer <br />City of Centerville <br />Centerville, MN <br />Kangas Tank Restoration <br />Beech Ave <br />Braham, MN <br />Cell 612-226-4067 <br />www.kangas tank inc@vahoo.com <br />Proposal <br />Water Tower Repairs <br />Kangas Tank Restoration is in the process of cleaning the exterior of the water tower to remove mold <br />and dirt. We have taken photos of previous damage to the towers rusted areas above the high water <br />level from previous work. May be due to rigging damage while painting the Centerville logo? The <br />repairs will require grinding and sanding to repair area 2 feet wide around the perimeter of the tower. <br />Then we will epoxy prime and finish coat. This process will take approximately 2 weeks depending on <br />weather conditions. We will keep the tower in operational use during this project. Kangas Tank <br />Restoration has evaluated the tower coating in excellent condition with minor repairs and should last <br />another 10 years. This quote includes replacing and plumbing the recirculation pump in lower cone tank <br />area. <br />Total estimated cost $11,800.00 <br />Thank you! <br />