My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-12 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
2023
>
2023-07-12 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 1:25:18 PM
Creation date
7/13/2023 10:52:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />TMI Coatings, Inc. <br />3291 Terminal Drive, St. Paul, Minnesota 55121-1610 Phone: 651-452-6100 Fax: 651-452-0598 <br />Painting & Restoration Contractors <br />City of Centerville NOTE: This proposal may be withdrawn by TMI if <br />Attn: Paul Palzer not accepted within 30 days. <br />2085 W Cedar Street <br />Centerville, MN 55038 <br />Phone:651-429-4750 <br />Email: PPalzer@centervillemn.com <br />Date: June 22, 2023 <br />Regarding: Water Tower Rehabilitation <br />City of Centerville Water Tower Coating Repair <br />TMI Coatings, Inc. (TMI) is a safety -conscious industrial painting and concrete coating contractor. We are a woman - <br />owned small business, have been in business for over 38 years, and are certified by AMPP as a QP1 and QP2 contractor. <br />The QP1 and QP2 qualifications are provided to contractors with proven experience, knowledge, and equipment to <br />produce high -quality work within safety guidelines and health and environmental standards. <br />We propose the following scope of work: <br />Pressure wash or solvent clean the affected area (2' wide band around the circumference of the top quarter of the tank, <br />above the logo) to clean the surface for coating application. All rust areas will be further cleaned in accordance with SSPC- <br />SP3 Power Tool Cleaning. A 2-coat epoxy -urethane system will be applied to the affected area. <br />YOUR COST, INCLUDING LABOR AND MATERIALS INSTALLED...............................$28,750 <br />NOTES: <br />1. Bid is based on one job mobilization/demobilization. <br />2. Performance and payment bonds are excluded. <br />3. No interior work of any kind is included. <br />4. Disposal of other debris by others. TMI will place debris in dumpsters provided by others. <br />5. Site utilities by others. <br />Thank you for the opportunity. If you have any questions about our bid, please call me at 651-452-6100. <br />ACCEPTANCE <br />The undersigned hereby acceptsTMI's proposal and authorizes TMI to furnish all materials and labor required to complete the work set forth in the <br />proposal pursuant to the proposal terms and conditions set forth on the reverse side hereof, for which we agree to pay you the amount set forth in <br />the proposal. If the proposal terms and conditions set forth on the reverse side hereof were not provided with the transmission of TMI's proposal by <br />facsimile, mail, or email, the undersigned agrees to request a copy of the proposal terms and conditions before signing below. The undersigned agrees <br />to be bound by the proposal terms and conditions set forth on the reverse side hereof, regardless of whether the undersigned requested a copy or <br />read them before signing below. <br />Accepted: Date <br />By <br />Title <br />Respectfully, <br />TMI Coatings, Inc. <br />By <br />Title Scott Salmon Construction M <br />Customer: Sign and return copy. Retain the original foryour files. <br />
The URL can be used to link to this page
Your browser does not support the video tag.