My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-26 Administrator's Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2023
>
2023-07-26 Administrator's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2023 7:25:53 AM
Creation date
7/26/2023 7:25:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
open on July 25, with a grand openingset for August 31. <br />1737 Main Street (Block 3) <br />The city was awarded a grant to complete soils and environmental reports for their property at 1737 Main <br />Street. As we continue to work with our prospective developer, this information will help guide their final <br />design. Currently, the developeris working to address parking and architectural comments from their <br />review at the Planning and Zoning Commission. We anticipate a resubmittal of drawings in the coming <br />weeks. <br />stnd <br />OldMillEstates1and2Additions <br />Most items are now complete. We are awaiting close-out of the wetland and watershed permits, prior to <br />releasing securities. <br />CentervilleStorage <br />Thefacilityisnowopenforbusiness.The developer hascompleteddrainage correctionsalong the north <br />side of the facility and will continue to work on watershed permit close-out. <br />BayViewVillas(WaterworksSite) <br />The developer’s landscaping crew has begunworknear the dock accessarea. Watershed permit closure is <br />also required, prior to release of the development securities. <br />RehbeinCommercial <br />thst <br />The sidewalk on the north side of Main Street, between 20Avenue and 21Avenue hasbeen installed. The <br />developer is working on final turf establishment and is working with staff to adjust their security to cover <br />the warranty period. Thedeveloper has also reestablished positive balances in their escrow accounts, which <br />will be heldopen until all securitieshave been released. <br />KwikTrip <br />Work is complete. We are working with the developer to close out the project. <br />RehbeinIndustrial <br />Record Plans for the project have been submitted and reviewed. Once permit closure is achieved, the project <br />can be closed out. <br />MaxStorage(FairviewStreet) <br />Grading has been completed. Sewer and water to Building #1 have been completed. Foundations have been <br />poured. The footings are being completed and the walls are being built. <br />AmazonFulfillmentCenter <br />On July 11, a Certificate of Occupancy was issued for the building, by our Building Inspection department! <br />Most site work, including, curb, paving, striping, signage and landscaping is now complete. The contractor <br />has shifted their focus to installing the electric vehicle charging stations. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.