Laserfiche WebLink
9ƭƷźƒğƷĻ ğǝĻƩğŭĻ ĭƚƭƷ ƦĻƩ ǒƓźƷ͵ ŷźƭ ŷĻƌƦƭ ƷŷĻ ĭźƷǤ ǒƓķĻƩƭƷğƓķ ǤƚǒƩ ƷğǣğĬƌĻ źƓǝĻƭƷƒĻƓƷ źƓ ƷŷĻ ƭźƷĻ͵LŅ ƷŷĻƩĻγƭ ğ ƩĻƷğźƌ ĭƚƒƦƚƓĻƓƷ Ʒƚ ǤƚǒƩ ķĻǝĻƌƚƦƒĻƓƷͲ ĻƭƷźƒğƷĻ ƷŷğƷ ǝğƌǒĻ ŷĻƩĻ͵Escrows <br /> for Engineer/Planner/Attorney Review not included hereRequired in M-1/M-2Fees lower for multiplex townhomes, Assumes townhome valuation between $100k-$500kAssumes retail value between <br /> $100k and $500kDiscounts may apply for near-identical unitsDirect charge from Met Council to CityPays for major city sewer infrastructurePays for major city water infrastructureCosts <br /> are included with the price of the landCosts are included with the price of the landEstimated based on 1.6 acres, roughlyassumes each unit is metered ($450ea is estimate)Waived due <br /> to site escrow depositCurrent asking priceMay be necessary to relocate sewer/water on site depending on layout. Developer should estimate. May be necessary to relocate trail depending <br /> on layout. Developer should estimate. Assessment for Recent Street Improvements on Sorel StreetEstimated; W. side CV Road only; one block; includes trees, lights, irrigation, swk., <br /> conc blvd. <br />0 <br />0000 <br />Љ <br />$0.00 <br />$0.0$0.0$0.0$0.0 <br />υЉ͵Љ <br />$53,950.0 <br />1 <br />07500 <br />Љ <br />$0.000%$0.00$0.00$0.00$0.00$0.00$0.000%$0.00$0.00100%$350,000.00 <br />υЉ͵ЉЉЉіυЉ͵ЉЉ <br />$500.000%$0.00$500.000%$0.00$569.570%$0.00$370.220%$0.00$360.000%$0.00 <br />$3,575.000%$0.00$3,999.850%$0.00 <br />$1,000.0 <br />$67,361.320%$0.00$43,784.860%$0.00$64,610.000%$0.00$29,900.0050%$29,900.00$24,050.0050%$24,050.00$78,000.000%$0.00$11,700.000%$0.00$30,000.000%$0.00$15,000.000%$0.00$16,039.5050%$16,039.50$99,900.004 <br />6%$85,100.00 <br />$78,000.0$12,060.0 <br />$115,660.9$122,559.8 <br />υАͲЊЎЉͲЉЉЉ͵ЉЉЉіυЉ͵ЉЉ <br />υАͲЊЎЉͲЉЉЉ͵Љ <br />іі <br />50%50% <br />100%100%100%100% <br />ЊЉЉЊЉЉ <br />0 26 7 000 50 0 0 <br />Љ Љ <br />ЉЉ <br />ЋЏ <br />υЉ͵ЉЋЏ͵ЉЉ <br />$500.00100%$569.57100% <br />$3,575.00100% <br />$1,000.0 <br />$67,361.3$43,784.8$64,610.0$59,800.0$48,100.0$78,000.0$12,060.0 <br />$115,660.9$176,509.8$383,230.82$329,280.82$53,950.00$612,079.00$160,939.50$451,139.50$995,309.82$490,220.32$505,089.50 <br />υАͲЊЎЉͲЉЉЉ͵Љ <br />υАͲЊЎЉͲЉЉЉ͵Љ <br />1 <br />ЏЉЊЋЏ͵Љ <br />2626262626 <br />ЊЉЉЉЉ͵ЉЉ <br /> <br />ƓźƷƭΉw9 <br />w9 <br /> <br />9ğĭŷЋ{C <br />ƓźƷƭ <br />ƓźƷƭ{C EA26$$$Yrs0 <br />Љ <br />ЉЏ <br />$138 <br />υЋЉ <br />$1,684 <br />υЋАЎͲЉЉ <br />Kennedy Property Development 8/29/2023 vǒğƓƷźƷǤ Affordable Housing <br />s <br />s <br />e <br />s <br />Block 7 RFP 2021Financial Commitment StatementFirm Name DateProject Summary Info <br />ItemUnit CostUnits# of UnitsTotal Cost% DeveloperDeveloper Commitment% CityRequested City CommitmentNotes.ǒźƌķźƓŭ ğƌǒğƷźƚƓ /ğƌĭǒƌğƷźƚƓʹwĻƭźķĻƓƷźğƌwĻƷğźƌƚƷğƌ wĻƭźķĻƓƷźğƌ 9ƨǒźǝğƌĻƓĭǤ <br /> <br />ƓźƷƭ Λw9 <br />ΜʹwĻƭźķĻƓƷźğƌЋwĻƷğźƌ w9 <br />ƭЉƚƷğƌ w9 <br />ƭ wƚǒƓķĻķ w9 <br />ƭ Financial CommitmentPlanning and Review Fees Preliminary Plat$500.00 per SitePUD for Conditional Use Permit$500.00 per Site1$500.00100%Total Planning Fees and EscrowBuilding Permit <br /> Fee Calculation:Residentail$2,590.82RetailPlan Review Res. (65% of permit cost)Plan Review Retail (65% of permit cost)$$370.22100%State Surcharge Res. (0.05% of valuation)State Surcharge <br /> Retail (0.05% of valuation)$$0.00100%Total Building Permit & Plan Review FeeUtility Fees SAC (MCES)$2,485 REUSAC (City)$2,300 REUWAC $1,850 REULateral Benefit Charge - Sewer$8,100 <br /> REUN/A$0.00Lateral Benefit Charge - Water$8,000 REUN/A$0.00Storm Water Area Charge$0.05739 SF69696$3,999.85100%Total Utility ChargesPark Dedication Fees Park Dedication Fee $3,000 REU26$78,000.00100 <br />%Total Park Dedication FeMisc Fees 3/4"" Meter$450.00meter26$11,700.0Erosion Control Site Fee$360.00site1$360.00100%Right of Way Permit$0.00site1$0.00100%Total Misc. FeeTotal City FeesOther <br /> Infrastructure Costs Land Sale$350,000.00site1$350,000.000%Utility Relocates$30,000.00site1$30,000.00100%Trail Reroute$15,000.00site1$15,000.00100%Sorel Street Improvements$32,079.00site1$32,079.005 <br />0%Streetscaping - Centerville Road$185,000.00site1$185,000.0054%Total Project Infrastructure CostsTotal Project Costs TIF Requested TIF TermTIF Category <br /> <br />