Page 2 <br />With this layout, it is expected that there will be days in-betweenvariouswork activities in which the <br />road could beopenedfor two way traffic(i.e. whileconcrete is curing). With this option, it would be <br />necessaryto widen certain portionsof the trail corridor to prepare it for recreational vehicletraffic. <br />The additional traffic control costs for this alternative are estimated as follows: <br />Option 1 - Utilize Trail Corridor with Flaggers <br />Estimated <br />DescriptionUnitQuantityUnit CostExtension <br />Flaggers - 2 workers x 17 days Hours340$90$30,600 <br />Prepare Trail Corridor for Vehicle TrafficLump Sum1$10,000$10,000 <br />Crew Time to Close Road at Beginning of Each Working DayHours17$600$10,200 <br />Crew Time to Re-Open Park Road at End of Each Working DayHours17$600$10,200 <br />Total Estimated Additional Cost - Option 1$61,000 <br />Option 2. Option 2 consists of requesting permission from the City of Centerville to utilize Mound <br />Trail as a Detour Route. If this alternative is utilized, the Detour Route wouldonly be utilized during <br />the reconstruction of the park entrance road, from Main Street to the campground road. This option <br />would requiresome grading at the south end of Mound Trail to remove the “hill”and would also <br />require that temporary gravel is placed on the temporary road connection. The additionaltraffic <br />control costs for this alternative are estimated as follows: <br />Option 2 - Utilize Mound Trail for Detour Route <br />Estimated <br />DescriptionUnitQuantityUnit CostExtension <br />Grading to Remove "Hill" and Prepare SubgradeLump Sum1$6,000$6,000 <br />Aggregate Base for Temporary RoadTon140$30$4,200 <br />Additional "Detour" SignageLump Sum1$800$800 <br />Total Estimated Additional Cost - Option 2$11,000 <br />The above costs are estimates of the “additional traffic control”costs only that are associated with the <br />reconstruction for each alternativeforthe 3,800 foot segment of park entrance road, and do not <br />representthe estimated total cost of traffic control for the entire project. It is our opinion that Option <br />2 would be preferrable to park visitors, particularly visitorsof the campground and/orboatlaunch that <br />may be operating recreational vehiclessuch asmotorhomes, pull behind camper trailers, andvehicle <br />and boat trailer combinations. <br /> <br />