My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-04-10 CC Packet - Rev. 1
Centerville
>
City Council
>
Agenda Packets
>
2024
>
2024-04-10 CC Packet - Rev. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 11:14:10 AM
Creation date
4/8/2024 11:13:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LaLonde Apartment Development Traffic StudyJanuary 8, 2024 <br />Page 2 <br /> <br />6. Analyze intersection capacity under existing and future year of opening (i.e., build) <br />conditions at the study intersection and proposed drivewayduring the weekday a.m. and <br />p.m. peak hours using Synchro/SimTraffic software; this task will identify levels of service, <br />queuing, and ultimately help determine benefits/impacts of the proposed development. <br />7. Identify and evaluate infrastructure changes needed to support the proposed development <br />(i.e., turn lane, traffic control, multimodal, etc.); a qualitative assessment of adjacent <br />redevelopment is included as part of this task, as well as a preliminary warrant (i.e., all-way <br />stop or signal) analysis. <br />8. Review the proposed site plan, as well as any other related internal or site-specific issues, <br />including circulation, access, sight distance, parking, and multimodal connections. <br />9. Prepare a draft report documenting the findings and recommendations. Make revisions as <br />appropriate based on City/County review and prepare a final report. <br />10. Prepare for and attend up to two (2) meetings (i.e., Planning Commission and/or City <br />Council) with the project team and/or City staff to discuss the study findings and <br />recommendations. <br />11. Provide day-to-day project management, administration, and quality control. <br />SCHEDULE <br />We are prepared to begin immediately and will complete this work within a mutually agreed- <br />upon schedule. A study of this magnitude generally takes approximately three to four weeks to <br />complete once data collection is completed. <br />BASIS OF PAYMENT/BUDGET <br />We propose to be reimbursed for our services on an hourly basis for actual time expended, <br />including travel time. Invoices are submitted monthly for work performed during the previous <br />month. Payment is due within 30 days. The cost of our services is estimated to range between <br />$6,000 and $8,000, depending on the requested services. The fee may be more or less than <br />estimated. <br />STANDARD TERMS AND CONDITIO1S <br />This proposal is valid for 90 days from issuance. TC2 reserves the right to adjust the fee after <br />90 days from the date of this proposal. A complete list of TC2’s standard terms and conditions <br />are listed in Attachment A. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.