Laserfiche WebLink
<br />24 <br />LOS F <br /><36,300<27,600<21,100<15,900 <br /> <br />21,100 <br />LOS E <br /><36,300<27,600<<15,900 <br /> <br />LOS D <br /><32,600<17,000 <br /><23,300<12,000 <br /> <br /> <br />29,100 <br />LOS C <br /><8,000 <br /><<19,400<12,700 <br /> <br /> <br />LOS B <br /><7,900<5,000 <br /><18,200<12,100 <br /> <br /> <br />LOS A <br /><7,600<4,900<3,100 <br /><11,400 <br /> <br />nene <br />lalanelalane <br />5-4-2- <br />3- <br />Facility <br /> <br /> <br />th <br />- <br />and <br />this <br />trail <br />and <br />and <br />(20 <br /> <br /> <br /> <br />and <br /> <br />, and <br />- <br />provide <br />lane with <br />- <br />section is <br />identifying <br />- <br />two <br />multiuse <br />a more urban <br />Note the LOS D <br /> <br />. Note that <br />as <br />The addition of a <br /> <br />shoulder widths <br />well <br />would result in more <br />character that the area <br />lane+ facility would also <br />. / <br /> <br />- <br /> <br />as <br />corridor cross <br />from 5,100 to 9,600 vehicles <br />A four <br /> <br />lane facility (i.e., a <br />- <br />turn lane) is expected to <br />- <br />residential <br />range <br />gutter), except near the CSAH 14 <br />section, which includes curb <br /> <br />- <br />- <br />Avenue) <br />contextually <br />capacity but <br /> <br />ed acceptable <br />ADT volumes along the CSAH 54 <br />a three th <br />level roadway capacity thresholds <br />and <br />lane urban facility with a <br />- <br />- <br />s, <br />- <br />way left <br />road type crashes. <br />- <br />- <br />term <br />- <br />suburban <br />off <br />- <br />nd Context <br />a three <br />a <br /> <br />run <br />and future cost considerations <br />way and environmental impacts. <br /> <br />- <br /> <br /> <br />of <br />the planning <br />, including variations in lane <br />- <br />term corridor capacity. <br />CSAH 54 (20 <br /> <br />- <br />traffic forecast <br />. The urban cross <br />section does not fit <br />reduce <br />- <br />the <br />is generally consider <br />Using <br />sufficient long <br /> <br />. <br />and fits with the <br />often promotes slower and more orderly vehicle speeds <br /> <br /> <br />section could be modified as the project moves into the <br />section <br />-- <br />Corridor Capacity Based on Avenue) corridor are expected toper daythe forecasted ADT volumes, turn lanes or a center twosufficient longprovide significant rightor betterThe existing <br /> generally rural (i.e., no curb(Main Street) area. As the area has developed over time, the existing rural crosscrossgutter,can help continuous multiuse trail also helps promote more <br /> multimodal activityhas become. Therefore, for purposes of the alternative development evaluation process, on one side of the roadway was used as the basis for potential impactscrossdesign <br /> processboulevard space. <br /> <br />