|
()-
<br />TAX INCREMENT FINANCING REDEVELOPMENT DISTRICT NO. 18
<br />Detailed List of Deficiencies and Costs to Repair
<br />Property/ItemCost to Repair Deficiency (Paul)Cost to Repair Deficiency (Dan)Cost to Repair Deficiency (Avg)
<br />LaLonde
<br />Basement foundation walls are failing and evidence of previous repairs are also
<br />failing$15,000$20,000$17,500
<br />The main beams of the first floor have been jacked to relevel the floor in 8 areas$3,000$5,000$4,000
<br />The ceiling height & obstacles in the basement is under six feet and exposed
<br />electrical fixtures$4,000$10,000$7,000
<br />Soil side loading on foundation walls is evident by inward bulging$5,000$5,000$5,000
<br />Stairway to the basement has many deficiencies including rise/run, threshold,
<br />landings, handrail, ceiling height, improper doorway placement$8,000$10,000$9,000
<br />Water piping include copper with leaded solder and galvanize piping$3,000$3,000$3,000
<br />Floor trusses in the basement are compromised by holes drilled in the lower 1” areas
<br />$8,000$5,000$6,500
<br />Crawl space area is un vented and no moisture protection in place$3,000$5,000$4,000
<br />Main floor shower ceiling is leaking$1,000$2,000$1,500
<br />Dryer is not properly vented$300$500$400
<br />Outlets have no grounded circuit and not proper spaced per code$6,000$15,000$10,500
<br />Bathroom lacks GFCI$300$500$400
<br />Gas Fireplace lacks proper venting$3,000$2,000$2,500
<br />Stairway to upper floor is deficient in rise/run, head height, guard height, spindle
<br />spacing, no handrail$8,000$7,000$7,500
<br />Inspection Report
<br />The attic space has no moisture barrier with open stairway, existing insulation is
<br />molded and falling, not properly vented$15,000$10,000$12,500
<br />$300$500$400
<br />Upper kitchen lacks GFCI, outlet spacing not proper
<br />$3,000$10,000$6,500
<br />Bathroom toilet spacing improper, walls cracked, floor not level
<br />Porch area floor not level, threshold too high, glazing in door not safety glazing$15,000$15,000$15,000
<br />North deck has improper ledger attachment as well as improper beam to post,
<br />$5,000$3,000$4,000
<br />rise/run improper and rail opening improper
<br />DRAFT AS OF JUNE 5, 2024 56
<br />
<br />
|