|
()-
<br />TAX INCREMENT FINANCING REDEVELOPMENT DISTRICT NO. 18
<br />Lack of smoke and CO detectors$1,000$500$750
<br />No radon mitigation system$6,000$5,000$5,500
<br />Total$112,900$134,000$123,450
<br />Brilowski
<br />Improper Stairway Rise/Run and Head Clerance$8,000$7,000$7,500
<br />Water Piping included some copper with leaded solder joints$5,000$5,000$5,000
<br />No radon mitigation$6,000$7,000$6,500
<br />Total$19,000$19,000$19,000
<br />Camp-Baron
<br />Foundation Failure$20,000$20,000$20,000
<br />Porch Base Failing$8,000$8,000$8,000
<br />Heating/Cooling/ERV Updates$15,000$15,000$15,000
<br />Copper Piping with lead solder joints$6,000$5,000$5,500
<br />Improper Stairway Rise/Run and Ceiling Height$8,000$7,000$7,500
<br />Inspection Report
<br />No Radon System$6,000$5,000$5,500
<br />Failing Roof Components$4,000$10,000$7,000
<br />Lack of Proper Weatherproofing of Windows and Siding$15,000$2,000$8,500
<br />Total$82,000$72,000$77,000
<br />DRAFT AS OF JUNE 5, 2024 57
<br />
<br />
|