My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2024
>
2024-07-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 4:41:49 PM
Creation date
7/3/2024 4:41:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff requested quotes for free standing or surface mounted handrail along the south side <br />of the sidewalk from the parking lot to city hall entrance. <br />Free Standing Rail <br />The free stand rail system would be poles offset 4” from the sidewalk every 5’ with 6” x <br />24” concrete footing which would allow for future replacement of the sidewalk. The cost <br />for this would be $11,200-$13,500 depending on style and finish. <br />Surface Mounted Rail <br />A surface mounted system would require 8” x 42” footings and cost $22,000.00. <br />Staff also requested a quote to replace the existing sidewalk and install a new one within <br />the same area. This would include #3 steel rods every 3’ on center in both directions, <br />4500psi concrete, a medium broom finish with cure and seal applied when completed. <br />This cost would be $7,625.00. <br />Staff Recommendation <br />Staff is recommending the installation of a free standing rail at a cost not to exceed <br />$13,500. While the walkway has minor deficiencies and aesthetic issues, it is still safe <br />and can be replaced at another time. <br /> <br /> <br />The full cost of the proposed staff-recommended irrigation and rail improvements is: <br />Boulevard Irrigation $18,100 <br />Walkway Handrail $13,500 <br />Total $31,600 <br />Each project is independent of the other and the Council could approve, either project, <br />both, or neither. <br /> <br />Funding for the project would come from the General Fund, fund balance. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.