My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
2024
>
2024-07-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 4:41:49 PM
Creation date
7/3/2024 4:41:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6) Constructionsitevehicleexitlocations,streetsandcurbandguttersystemswithin <br />andadjacenttotheprojectmustbeinspectedforsedimentationfromerosionor <br />trackedsedimentfromvehicles. <br />a) Sedimentmustberemovedfromallpavedsurfaceswithinone(1)calendarday <br />ofdiscoveryor,ifapplicable,withinashortertimetoavoidasafetyhazardto <br />usersofpublicstreets; <br />7) Perimetercontroldevicesmustberepaired,replaced,orsupplementedwhenthey <br />becomenonfunctionalorthesedimentreaches½oftheheightofthedevice; <br />8) Whenthedepthofsedimentcollectedintemporaryandpermanentsedimentation <br />basinsreaches½thestoragevolume,thebasinsmustbedrainedandsediment <br />removed.Thismustoccurwithin72hoursofdiscovery; <br />9) Atleastoneindividualpresentonthesite(oravailabletotheprojectsiteinthree <br />(3)calendardays)mustbetrainedinthejobdutiesofoverseeingthe <br />implementationof,revisingand/oramendingthesiteplansandperforming <br />inspectionsfortheproject; <br />10) Inspectionschedulesmaybeadjustedasfollows: <br />a) Inspectionsofareaswithpermanentcovercanbereducedtooncepermonth, <br />evenifconstructionactivitycontinuesonotherportionsofthesite;or <br />b) Wheresiteshavepermanentcoveronallexposedsoilandnoconstruction <br />activityisoccurringanywhereonthesite,inspectionscanbereducedtoonce <br />permonthand,after12months,maybesuspendedcompletelyuntil <br />constructionactivityresumes.The CityofCenterville mayrequireinspections <br />toresumeifconditionswarrant; <br />c) hereconstructionactivityhasbeensuspendedduetofrozenground <br />conditions,inspectionsmaybesuspended.Inspectionsmustresumewithin24 <br />hoursofrunoffoccurring,oruponresumingconstruction,whichevercomes <br />first;or <br />d) projectswhereapollinatorhabitatornativeprairietypevegetativecoverare <br />beingestablished,inspectionsmaybereducedtooncepermonthifthesitehas <br />temporaryvegetationwithadensityof70%uniformcover.Ifafter24months <br />nosignificanterosionproblemsareobserved,inspectionsmaybesuspended <br />completelyuntiltheterminationrequirementsidentifiedin2.c.vibeloware <br />met. <br />11) Inspectionsandmaintenanceactivitiesmustberecordedwithin24hoursofbeing <br />conductedandtheserecordsmustberetainedwiththesiteplan.Theserecords <br />mustinclude: <br />a) Dateandtimeofinspections; <br />b) Nameofperson(s)conductinginspections; <br />c) Accuratefindingsofinspections,includingthespecificlocationwhere <br />correctiveactionsareneeded; <br />d) Correctiveactionstaken(includingdates,times,andpartycompleting <br />maintenanceactivities); <br />March2024|wqstrm498 <br />Page 12 of 23 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.