My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
2024
>
2024-07-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 4:41:49 PM
Creation date
7/3/2024 4:41:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4) Ifpondingisused,thedesignmustincludeanappropriatecombinationofmeasures <br />suchasshading,vegetatedswaledischargesorconstructedwetlandtreatmentcells <br />thatlimittemperatureincreases.Thepondmustbedesignedasadrypondand <br />shoulddrawdownin24hoursorless;and <br />5) Othermethodsthatminimizeanyincreaseinthetemperatureofthetroutstream. <br />Note:Itemsvi.15areonlyrequiredifyouhavedischargestoatroutstreamwithinyourjurisdiction. <br />viii. OffsiteTreatment ΝLƷĻƒƭЋЉ͵ЊЉЋЉ͵ЊЍΞ <br />1) Fornonlinearprojects,wherethewaterqualityvolumecannotcosteffectivelybe <br />treatedonthesiteoftheoriginalconstructionactivity,theremainingwaterquality <br />volumemustbeaddressedthroughoffsitetreatmentandmeetthefollowing <br />requirements(mustbeselectedinthefollowingorderofpreference): <br />a) Locationsthatyieldbenefitstothesamereceivingwaterthatreceivesrunofffrom <br />theoriginalconstructionactivity. <br />b) LocationswithinthesameDNRcatchmentareaastheoriginalconstruction <br />activity. <br />c) LocationsinthenextadjacentDNRcatchmentareaupstream. <br />d) Locationsanywherewithinthe Cityof/ĻƓƷĻƩǝźƌƌĻƭ jurisdiction. <br />2) Offsitetreatmentprojectsmustinvolvethecreationofnewstructuralstormwater <br />BMPsortheretrofitofexistingstructuralstormwaterBMPs,ortheuseofaproperly <br />designedregionalstructuralstormwaterBMP.Routinemaintenanceofstructural <br />stormwaterBMPsownedoroperatedby theCityofCenterville cannotbeusedto <br />meetthisrequirement. <br />3) Offsitetreatmentprojectsmustbecompletednolaterthan <br />24monthsafterthestartoftheoriginalconstructionactivity. <br />4) Theapplicantmayprovidepaymenttothe CityofCenterville inlieuofoff <br />sitetreatment. <br />Note:Itemsviii.14arediscretionaryanditisuptotheMS4iftheywouldliketoallowtheseoffsitetreatment <br />optionswithintheirjurisdictionsandincludethemintheirordinance.However, <br />iftheMS4doesnotadoptthese <br />items,theexpectationisthatthewaterqualityvolumewillbetreatedonsite. <br />March2024|wqstrm498 <br />Page 17 of 23 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.