My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-22 CC Packet - (Revised 1)
Centerville
>
City Council
>
Agenda Packets
>
2025
>
2025-01-22 CC Packet - (Revised 1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2025 4:34:39 PM
Creation date
1/22/2025 4:34:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We have the capacity and intend to pay you back with water. <br />A meeting would still be valuable to work out the logistics of how we do this and also to discuss the <br />future of the interconnect(s). <br />We are available at all of the times you suggested. Go ahead and send out an Outlook invite when <br />you’ve picked a time. <br />Thanks. <br />Mark Statz, PE <br />City Administrator/Engineer <br />City of Centerville <br />1880 Main St. <br />Centerville, MN 55038 <br />O: 651-429-3232 <br />D: 651-792-7931 <br />C: 651-775-5126 <br />mstatz@centervillemn.com <br />www.centervillemn.com <br />@centervillemn <br />From: Diane Hankee <DHankee@linolakes.us> <br />Sent: Wednesday, February 14, 2024 9:28 AM <br />To: Mark Statz <MStatz@centervillemn.com> <br />Cc: Paul Palzer <PPalzer@centervillemn.com>; Justin Williams <JWilliams@linolakes.us>; Michael <br />Grochala <MGrochala@linolakes.us> <br />Subject: RE: Watermain Interconnect Issues <br /> <br />Mark, <br />st <br />Let’s set up a meeting the week of Feb 26. We have a meter reading at 21 St of 25.4 mg and are <br />drafting an invoice reflecting this amount. We are also having our engineer review the impacts to <br />st <br />our system if pushed back. Has your 21 Street connection been calibrated? <br /> <br />It would beneficial if both cities took a reading of the Cedar street meters so that we understand <br />how that is operating. <br />Do we need to have either connection open? Is there any other information we need prior to the <br />meeting. <br /> <br />Dates for a virtual meeting: <br />Feb 27 at 3pm <br />Feb 28 – 1-4pm <br />March 1 8am – 11am or 1pm to 4pm <br />Thank you, <br /> <br />108 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.