My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-22 CC Packet - (Revised 1)
Centerville
>
City Council
>
Agenda Packets
>
2025
>
2025-01-22 CC Packet - (Revised 1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2025 4:34:39 PM
Creation date
1/22/2025 4:34:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I believe we have an escrow from Amazon (or maybe from Ryan Co.) that is awaiting a noise <br />study to show that a noise wall is not needed. I think the idea was to have the facility up and <br />running in a “normal” operation before we did the study and I think we landed on waiting a <br />year. We are fast approaching the 1-year anniversary of opening. So, let’s touch base on how <br />to go about getting that study done so we can make a determination on a noise wall or escrow <br />release. Thanks. <br />Mark Statz, PE <br />City Administrator/Engineer <br />City of Centerville <br />1880 Main St. <br />Centerville, MN 55038 <br />O: 651-429-3232 <br />D: 651-792-7931 <br />C: 651-775-5126 <br />mstatz@centervillemn.com <br />www.centervillemn.com <br />@centervillemn <br />92 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.