Laserfiche WebLink
I believe we have an escrow from Amazon (or maybe from Ryan Co.) that is awaiting a noise <br />study to show that a noise wall is not needed. I think the idea was to have the facility up and <br />running in a “normal” operation before we did the study and I think we landed on waiting a <br />year. We are fast approaching the 1-year anniversary of opening. So, let’s touch base on how <br />to go about getting that study done so we can make a determination on a noise wall or escrow <br />release. Thanks. <br />Mark Statz, PE <br />City Administrator/Engineer <br />City of Centerville <br />1880 Main St. <br />Centerville, MN 55038 <br />O: 651-429-3232 <br />D: 651-792-7931 <br />C: 651-775-5126 <br />mstatz@centervillemn.com <br />www.centervillemn.com <br />@centervillemn <br />92 <br /> <br />