My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-02-05 P & R WS & Meeting
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
2025
>
2025-02-05 P & R WS & Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2025 3:37:08 PM
Creation date
1/31/2025 3:36:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposals are encouraged to incorporate more than the minimums <br />for adaptive/inclusive equipment where practical. <br />The P&R Committee has selected some examples of <br />adaptive/inclusive equipment that they preferred and encourages <br />proposals to utilize similarly styled equipment but welcomes other <br />ideas as well. <br /> ADA qualifying fall zone protection and accessible route surfacing <br />should be included in your proposal where necessary to <br />accommodate adaptive/inclusive equipment. <br /> All equipment and materials must be chosen from those pre-approved through the <br />StateÓs Cooperative Purchasing Venture (State Bid). <br /> Review and evaluate each piece of existing play equipment and propose to either: <br />o Remove and dispose of the equipment <br />o Salvage and deliver to alternate park location for reinstallation by others <br />o Leave in place, refurbish and incorporate into the new playground <br /> Meet all applicable standards for playgrounds and playground equipment. <br /> Complete the work during the 2025 construction season. <br /> <br />Existing Conditions <br /> The city does not have a topographic survey of the site. Proposers will need to <br />rely on aerial photos and available contours. <br /> The city does not have soil borings in the area. Our soils here are often heavy <br />clay with perched water lenses. Full-depth frost footings are a minimum <br />consideration along with an underdrain system. <br /> There are very few utilities in the area. A GSOC Ticket is, of course, a necessity <br />but we do not anticipate major utility conflicts. <br /> A trail system exists in the area. The proposal should include any connections to <br />that system. <br /> <br />Pre-Proposal Meeting <br />The city will host a pre-proposal meeting, on-site, to answer any questions you may have. <br />A representative from your firm should attend. All questions asked at the meeting will be <br />logged and a formal, written response will be distributed to all proposing firms, prior to <br />the submittal deadline. <br /> <br />Proposal Due Date/Time <br />The official Request for Proposals will be sent out, via email, on February 6, by the end <br />of the workday. Proposals are due by 4:00 PM on February 26 and may be hand- <br />delivered to City Hall or emailed to tbender@centervillemn.com. Late proposals will not <br />be considered. <br />Contract Award <br />It is anticipated that the evaluation panel will put forth a recommendation to the P&R <br />Committee at their regular meeting on April 2. The City Council will, then, consider the <br />recommendations of the P&R Committee at their April 23 meeting. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.