My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #25-009 - Receiving Feasibility Report & Calling Hearing on Improvement - 2025 Thin Overlay Street Imp.
Centerville
>
City Council
>
Resolutions
>
2025
>
Res. #25-009 - Receiving Feasibility Report & Calling Hearing on Improvement - 2025 Thin Overlay Street Imp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 3:34:30 PM
Creation date
2/18/2025 10:52:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 THIN OVERLAY PROJECT <br />Project Costs <br />CONSTRUCTION COSTS <br />Cost estimates for each of the roads are shown below. This cost estimate is based on bid prices <br />from recent projects and include a 15% contingency. <br />SOFT COSTS <br />In addition to construction costs, other costs which affect the overall project costs include legal, <br />engineering feasibility, design and construction administration costs. These costs are estimated at <br />10% of construction costs and are included in the total project costs presented below. <br />PROJECT COSTS <br />Total project costs are the total of both construction and soft costs and are summarized below: <br />Location <br />Approximate <br />Length [LF] <br />Estimated Project <br />Costs Per Lineal Foot <br />Estimated Total <br />Project Costs <br />1" Overlays <br />LaMotte Drive <br />1175 <br />$83.54 <br />$98,164 <br />Heritage Street (W of Centerville Rd) <br />610 <br />$83.54 <br />$50,962 <br />Center Street (W of Dupre Rd) <br />1950 <br />$83.54 <br />$162,910 <br />Oak Circle* <br />500 <br />$83.54 <br />$41,772 <br />Tourville Circle* <br />450 <br />$83.54 <br />$37,595 <br />Pheasant Lane (Center St to 280' N <br />of Partridge PI) <br />500 <br />$83.54 <br />$41,772 <br />Brian Drive (Main St to 130' N of Brian <br />Ct) <br />775 <br />$83.54 <br />$64,746 <br />Shad Ave <br />1270 <br />$83.54 <br />$106,100 <br />Peltier Circle <br />1550 <br />$83.54 <br />$129,492 <br />Old Mill Rd (City Limits to 320' N of <br />Revoir St) <br />670 <br />$83.54 <br />$55,974 <br />TOTAL OVERLAY <br />9450 <br />Estimated Total Project Cost <br />$789,486 <br />*Length includes equivalent footages to account for cul-de-sacs <br />City of Centerville Page 4 <br />2025 Thin Overlay Project Stantec 193807381 <br />
The URL can be used to link to this page
Your browser does not support the video tag.