My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #25-009 - Receiving Feasibility Report & Calling Hearing on Improvement - 2025 Thin Overlay Street Imp.
Centerville
>
City Council
>
Resolutions
>
2025
>
Res. #25-009 - Receiving Feasibility Report & Calling Hearing on Improvement - 2025 Thin Overlay Street Imp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 3:34:30 PM
Creation date
2/18/2025 10:52:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 THIN OVERLAY PROJECT <br />Project Summary and Proposed Improvements <br />PROJECT SUMMARY <br />Streets to be included in the 2025 Thin Overlay Project are shown in the table below and in Figure 1 <br />in the Appendix. All the streets were constructed or reconstructed in the mid 2000's. Locations were <br />determined by the Centerville Thin Overlay Program's goal of overlaying streets around the age of <br />15 years since the last improvement, coupled with site investigations by the city engineer and public <br />works foreperson to assess the condition of various streets. All streets listed will receive a 1-inch mill <br />and overlay. The mill depth may vary at the crown as needed to establish better cross -slope. Milled <br />areas will receive bituminous tack and a bituminous wear -course. All castings will be adjusted as <br />needed with either steel adjusting rings or replacement of all rings with new concrete adjustment <br />rings and an external seal. It is anticipated that a minimal amount of concrete curb replacement <br />and bituminous patching will be needed as well. Curb replacement quantities and bituminous <br />patching needs will be addressed by the City's public works department prior to the project bid. <br />Proposed <br />Year <br />Road Name <br />Length [ft] <br />Overlay <br />Constructed/Previous <br />Years since Last <br />Depth <br />Improvement <br />Improvement <br />LaMotte Drive <br />1175 <br />1,, <br />2004 <br />21 <br />Heritage Street (W of Centerville <br />610 <br />1,, <br />2004 <br />21 <br />Rd) <br />Center Street (W of Dupre Rd) <br />1950 <br />1,, <br />2004 <br />21 <br />Oak Circle <br />500 <br />1,, <br />2004 <br />21 <br />Tourville Circle <br />450 <br />1,, <br />2004 <br />21 <br />Pheasant Lane (Center St to 280' N <br />500 <br />1,, <br />2004 <br />21 <br />of Partridge PI) <br />Brian Drive (Main St to 130' N of <br />775 <br />1,, <br />2004 <br />21 <br />Brian Ct <br />Shad Ave <br />1270 <br />1,, <br />2004 <br />21 <br />Peltier Circle <br />1550 <br />1,, <br />2003 <br />21 <br />Old Mill Rd (City Limits to 320' N of <br />670 <br />1,, <br />2007 <br />18 <br />Revoir St <br />Total <br />19450 <br />City of Centerville Page 3 <br />2025 Thin Overlay Project Stantec 193807381 <br />
The URL can be used to link to this page
Your browser does not support the video tag.