Laserfiche WebLink
Project Name: <br />2025 Thin Overlay Street Improvements <br />I hereby certify that this is an exact <br />reproduction of bids received. <br />City Project No.: <br />Stantec Project No.:193807381 <br />Bid Opening: <br />Tuesday, April 22, 2025 at 10:00 AM CDTOwner:Centerville, Minnesota <br />Kellie Schlegel, P.E. <br />License No. 46200 <br />Bidder No. 1Bidder No. 2Bidder No. 3Bidder No. 4 <br />Asphalt Surface Technologies Corp.North Valley, Inc.North Oaks PavingPark Construction Company <br />BID TABULATION <br />Item <br />ItemUnitsQtyUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotal <br />Num <br />BASE BID <br />1MOBILIZATIONLS1$13,850.00$13,850.00$20,706.79$20,706.79$27,000.00$27,000.00$20,000.00$20,000.00 <br />2TRAFFIC CONTROLLS1$2,740.00$2,740.00$3,688.93$3,688.93$7,500.00$7,500.00$40,460.00$40,460.00 <br />3INLET PROTECTIONEA32$165.00$5,280.00$48.82$1,562.24$175.00$5,600.00$159.00$5,088.00 <br />4REMOVE AND REPLACE CONCRETE CURB & GUTTERLF1800$40.15$72,270.00$44.17$79,506.00$38.50$69,300.00$52.80$95,040.00 <br />5REMOVE BITUMINOUS PAVEMENT (PATCHING)SY1000$9.57$9,570.00$8.83$8,830.00$15.00$15,000.00$5.05$5,050.00 <br />6REMOVE CONCRETE DRIVEWAY PAVEMENTSF800$2.20$1,760.00$2.51$2,008.00$3.00$2,400.00$1.65$1,320.00 <br />7REMOVE BITUMINOUS DRIVEWAY PAVEMENTSF1400$1.65$2,310.00$0.99$1,386.00$2.50$3,500.00$1.40$1,960.00 <br />8REMOVE CONCRETE PEDESTRIAN CURB RAMP (INCLUDSF100$2.20$220.00$2.52$252.00$3.50$350.00$2.45$245.00 <br />9MILL BITUMINOUS PAVEMENT (1" DEPTH)SY25000$1.30$32,500.00$1.19$29,750.00$0.60$15,000.00$1.20$30,000.00 <br />10MILL BITUMINOUS CONSTRUCTION JOINTLF350$3.50$1,225.00$4.34$1,519.00$2.50$875.00$1.65$577.50 <br />11SUBGRADE EXCAVATION (EV)CY400$27.50$11,000.00$53.48$21,392.00$56.00$22,400.00$46.40$18,560.00 <br />12AGGREGATE BASE, CLASS 5TN500$30.36$15,180.00$36.22$18,110.00$34.00$17,000.00$37.10$18,550.00 <br />13RECONSTRUCT INVERT/DOGHOUSEEA18$1,056.00$19,008.00$488.24$8,788.32$620.00$11,160.00$603.00$10,854.00 <br />14VALVE BOX TOP SECTIONEA4$330.00$1,320.00$228.24$912.96$525.00$2,100.00$458.00$1,832.00 <br />15ADJUST VALVE BOXEA12$330.00$3,960.00$504.52$6,054.24$425.00$5,100.00$363.00$4,356.00 <br />16REMOVE AND REPLACE SANITARY MANHOLE FRAME ANEA2$935.00$1,870.00$493.94$987.88$1,950.00$3,900.00$500.00$1,000.00 <br />17REMOVE AND REPLACE MANHOLE ADJUSTING RINGSEA35.00$1,001.00$35,035.00$668.09$23,383.15$1,125.00$39,375.00$1,010.00$35,350.00 <br />18REMOVE AND REPLACE CATCH BASIN ADJUSTING RINGEA32$660.00$21,120.00$593.12$18,979.84$750.00$24,000.00$654.00$20,928.00 <br />19BITUMINOUS MATERIAL FOR TACK COATGAL1300$3.00$3,900.00$3.20$4,160.00$5.50$7,150.00$2.70$3,510.00 <br />20BITUMINOUS OVERLAY WEAR COURSE (SPWEA340B)TN1950$76.23$148,648.50$81.84$159,588.00$92.00$179,400.00$84.40$164,580.00 <br />21BITUMINOUS NON-WEAR COURSE MIXTURE FOR PATCHTN80$141.13$11,290.40$200.72$16,057.60$125.00$10,000.00$122.00$9,760.00 <br />22BITUMINOUS WEAR COURSE MIXTURE FOR DRIVEWAYSTN40$181.50$7,260.00$157.32$6,292.80$125.00$5,000.00$234.00$9,360.00 <br />236-INCHES THICK CONCRETE PEDESTRIAN CURB RAMPSF100$15.40$1,540.00$8.68$868.00$15.00$1,500.00$8.35$835.00 <br />24TRUNCATED DOME PANELSF10$55.00$550.00$86.80$868.00$100.00$1,000.00$83.30$833.00 <br />256-INCHES THICK CONCRETE DRIVEWAYSF800$8.80$7,040.00$10.85$8,680.00$15.00$12,000.00$10.40$8,320.00 <br />26CROSSWALK MARKING, EPOXYSF200$7.15$1,430.00$5.64$1,128.00$9.50$1,900.00$6.75$1,350.00 <br />27RESTORATION (TOPSOIL, SEED WITH HYDROMULCH)SY500$10.78$5,390.00$11.64$5,820.00$7.50$3,750.00$17.20$8,600.00 <br />28STREET SWEEPER WITH PICKUP BROOM AND OPERATORHR20$198.00$3,960.00$92.22$1,844.40$250.00$5,000.00$184.00$3,680.00 <br />TOTAL PART A: THIN BITUMINOUS OVERLAY$441,226.90$453,124.15$498,260.00$521,998.50 <br />ALTERNATE NO. 1: OLD MILL ROAD <br />29MOBILIZATIONLS1$7,575.75$7,575.75$3,781.14$3,781.14$3,500.00$3,500.00$1,040.00$1,040.00 <br />30TRAFFIC CONTROLLS1$825.00$825.00$813.73$813.73$2,500.00$2,500.00$459.00$459.00 <br />31INLET PROTECTIONEA4$165.00$660.00$244.12$976.48$175.00$700.00$158.00$632.00 <br />32REMOVE AND REPLACE CONCRETE CURB & GUTTERLF135$45.10$6,088.50$44.17$5,962.95$42.00$5,670.00$52.70$7,114.50 <br />33REMOVE BITUMINOUS PAVEMENT (PATCHING)SY50$9.57$478.50$8.84$442.00$15.00$750.00$5.05$252.50 <br />BT-1 <br />193807381-Bid Tabs.xlsm <br />80 <br /> <br />