Laserfiche WebLink
Bidder No. 1Bidder No. 2Bidder No. 4Bidder No. 3 <br />Asphalt Surface Technologies Corp.North Valley, Inc.North Oaks PavingPark Construction Company <br />BID TABULATION <br />Item <br />ItemUnitsQtyUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotal <br />Num <br />34REMOVE CONCRETE DRIVEWAY PAVEMENTSF100$2.20$220.00$2.52$252.00$3.50$350.00$1.65$165.00 <br />35REMOVE BITUMINOUS DRIVEWAY PAVEMENTSF100$1.65$165.00$1.63$163.00$2.50$250.00$1.40$140.00 <br />36MILL BITUMINOUS PAVEMENT (1" DEPTH)SY1850$1.98$3,663.00$1.69$3,126.50$0.60$1,110.00$2.05$3,792.50 <br />37MILL BITUMINOUS CONSTRUCTION JOINTLF65$3.85$250.25$6.51$423.15$2.50$162.50$1.65$107.25 <br />38SUBGRADE EXCAVATION (EV)CY50$27.50$1,375.00$53.49$2,674.50$35.00$1,750.00$46.40$2,320.00 <br />39AGGREGATE BASE, CLASS 5TN30$33.00$990.00$36.23$1,086.90$56.00$1,680.00$37.10$1,113.00 <br />40RECONSTRUCT INVERT/DOGHOUSEEA1$1,056.00$1,056.00$488.24$488.24$625.00$625.00$603.00$603.00 <br />41ADJUST VALVE BOXEA1$330.00$330.00$504.52$504.52$425.00$425.00$365.00$365.00 <br />42REMOVE AND REPLACE MANHOLE ADJUSTING RINGSEA3$1,001.00$3,003.00$668.09$2,004.27$1,125.00$3,375.00$1,010.00$3,030.00 <br />43REMOVE AND REPLACE CATCH BASIN ADJUSTING RINGEA3$660.00$1,980.00$593.13$1,779.39$750.00$2,250.00$654.00$1,962.00 <br />44BITUMINOUS MATERIAL FOR TACK COATGAL95$3.00$285.00$4.07$386.65$5.50$522.50$2.70$256.50 <br />45BITUMINOUS OVERLAY WEAR COURSE (SPWEA340B)TN150$76.23$11,434.50$81.84$12,276.00$92.00$13,800.00$95.30$14,295.00 <br />46BITUMINOUS NON-WEAR COURSE MIXTURE FOR PATCHTN10$141.13$1,411.30$200.72$2,007.20$125.00$1,250.00$122.00$1,220.00 <br />47BITUMINOUS WEAR COURSE MIXTURE FOR DRIVEWAYS TN5$181.50$907.50$179.02$895.10$125.00$625.00$234.00$1,170.00 <br />486-INCHES THICK CONCRETE DRIVEWAYSF100$8.80$880.00$10.85$1,085.00$15.00$1,500.00$10.40$1,040.00 <br />49RESTORATION (TOPSOIL, SEED WITH HYDROMULCH)SY75$10.78$808.50$11.65$873.75$7.50$562.50$17.30$1,297.50 <br />50STREET SWEEPER WITH PICKUP BROOM AND OPERATORHR5$198.00$990.00$92.22$461.10$250.00$1,250.00$173.00$865.00 <br />TOTAL ALTERNATE NO. 1: OLD MILL ROAD <br />$45,376.80$42,463.57$44,607.50$43,239.75 <br />ALTERNATE NO. 2: BRIAN DRIVE <br />51MOBILIZATIONLS1$7,612.50$7,612.50$3,781.14$3,781.14$3,500.00$3,500.00$1,040.00$1,040.00 <br />52TRAFFIC CONTROLLS1$825.00$825.00$813.73$813.73$2,500.00$2,500.00$459.00$459.00 <br />53INLET PROTECTIONEA2$165.00$330.00$244.12$488.24$175.00$350.00$159.00$318.00 <br />54REMOVE AND REPLACE CONCRETE CURB & GUTTERLF155$45.10$6,990.50$44.17$6,846.35$42.00$6,510.00$52.80$8,184.00 <br />55REMOVE BITUMINOUS PAVEMENT (PATCHING)SY45$9.57$430.65$8.84$397.80$15.00$675.00$5.05$227.25 <br />56REMOVE CONCRETE DRIVEWAY PAVEMENTSF100$2.20$220.00$2.52$252.00$3.50$350.00$1.65$165.00 <br />57REMOVE BITUMINOUS DRIVEWAY PAVEMENTSF100$1.65$165.00$1.63$163.00$2.50$250.00$1.40$140.00 <br />58MILL BITUMINOUS PAVEMENT (1" DEPTH)SY1900$1.98$3,762.00$1.70$3,230.00$0.60$1,140.00$2.05$3,895.00 <br />59MILL BITUMINOUS CONSTRUCTION JOINTLF60$3.85$231.00$6.51$390.60$2.50$150.00$1.65$99.00 <br />60SUBGRADE EXCAVATION (EV)CY50$27.50$1,375.00$53.49$2,674.50$35.00$1,750.00$46.40$2,320.00 <br />61AGGREGATE BASE, CLASS 5TN30$33.00$990.00$36.23$1,086.90$56.00$1,680.00$37.10$1,113.00 <br />62RECONSTRUCT INVERT/DOGHOUSEEA1$1,056.00$1,056.00$488.24$488.24$625.00$625.00$603.00$603.00 <br />63REMOVE AND REPLACE MANHOLE ADJUSTING RINGSEA2$1,001.00$2,002.00$668.09$1,336.18$1,125.00$2,250.00$1,010.00$2,020.00 <br />64REMOVE AND REPLACE CATCH BASIN ADJUSTING RINGEA2$660.00$1,320.00$593.12$1,186.24$750.00$1,500.00$654.00$1,308.00 <br />65BITUMINOUS MATERIAL FOR TACK COATGAL100$3.00$300.00$4.07$407.00$5.50$550.00$2.70$270.00 <br />66BITUMINOUS OVERLAY WEAR COURSE (SPWEA340B)TN150$76.23$11,434.50$81.84$12,276.00$92.00$13,800.00$95.30$14,295.00 <br />67BITUMINOUS NON-WEAR COURSE MIXTURE FOR PATCHTN15$141.13$2,116.95$200.72$3,010.80$125.00$1,875.00$122.00$1,830.00 <br />68BITUMINOUS WEAR COURSE MIXTURE FOR DRIVEWAYS TN5$181.50$907.50$179.02$895.10$125.00$625.00$234.00$1,170.00 <br />696-INCHES THICK CONCRETE DRIVEWAYSF100$10.34$1,034.00$10.85$1,085.00$15.00$1,500.00$10.40$1,040.00 <br />70RESTORATION (TOPSOIL, SEED WITH HYDROMULCH)SY90$10.78$970.20$11.65$1,048.50$7.50$675.00$17.20$1,548.00 <br />71STREET SWEEPER WITH PICKUP BROOM AND OPERATORHR5$198.00$990.00$92.22$461.10$250.00$1,250.00$173.00$865.00 <br />TOTAL ALTERNATE NO. 2: BRIAN DRIVE <br />$45,062.80$42,318.42$43,505.00$42,909.25 <br />BT-2 <br />193807381-Bid Tabs.xlsm <br />81 <br /> <br />