Laserfiche WebLink
Stantec Consulting Services Inc. <br />733 Marquette Avenue, Suite 1000 <br />MinneapolisMN55402-2314 <br />June 19, 2025 <br />Athanasia Lewis - Interim City Administrator <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br />Dear Ms. Lewis, <br />Reference: Proposal for Engineering Services Bridge 02J04 (Brian Drive Culvert) Replacement <br />This letter outlines the Scope of Services and estimated fees for providing engineering services for the <br />replacement of Bridge 02J04 which carries Brian Drive over Clearwater Creek. The replacement of this <br />bridge will improve public safety as this bridge is currently categorized as deficient. <br />PROJECT UNDERSTANDING <br />The existing bridge consists of a double corrugated metal pipe (CMP) culvert. The most recent Mn/DOT <br />Structure Inventory and Inspection Report indicates that while the overall condition of Bridge 02J04 is fair, it <br />is currently load posted due to a lack of cover. The Local Planning Index (LPI) of 46 makes this bridge <br />eligible for replacement funds from the State Transportation Fund (Bridge Bonds). As Centerville is not a <br />Municipal State Aid City, Anoka County would need to act as the sponsor for this project. <br />We anticipate that a precast concrete box culvert is the preferred replacement structure. The proposed <br />improvements will generally match/accommodate the existing urban section roadway as well as the existing <br />pathway along the west side of Brian Drive. We will explore the option to either extend the culvert and <br />eliminate the need for a parapet wall, or to terminate the culverts with a headwall(s) and to provide a <br />parapet wall similar to what is currently in place adjacent to the trail. <br />Work tasks are described in the Project Work Plan below. Funds to construct the project <br />are anticipated to come primarily from the State Transportation Fund (Bridge Bonds), which are generally <br />distributed on first come basis. Work under this agreement will be considered complete at the time <br />when State Aid accepts the project and places it in line for funding. <br />After funds become available and the Project is authorized by MnDOT, the bidding process can commence. <br />At that time, under a separate agreement, Stantec will finalize the project for bidding, including <br />completion of Project Manual (Procurement and Contraction Requirements Group and the <br />Specifications Group), and if requested, construction services. <br />31 <br /> <br />