Laserfiche WebLink
Proposed Track Design <br />Tore Size IaY x 4w with in, wine lames <br />Lame WIM with bared berm <br />Several jumps and bumps along straight away= <br />Simple devgn to keen costs law <br />ARow foi all ages, newer ability, and RC can <br />n <br />Costs to build and maintain <br />2 hours mowing grass <br />• 4-6 hours of skirl steer wor k <br />• 2 trucks of gravely dirt <br />• 600' of tubing ($40 per 100') = $240 <br />• Hand shoveling and taking (done by volunteers) <br />• Maintenance <br />• Mowing around track <br />• Repaving and raking track (done by volunteers) <br />Potential locations <br />Acorn Creek Park— My understand is this area was slated for soccer fields but the location was not flat enough? <br />2 <br />5 <br />