My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026 Neighboring City Research
Centerville
>
Ordinances
>
Uncoded Ordinances
>
Research for 2026 Fees
>
2026 Neighboring City Research
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 9:25:29 AM
Creation date
12/9/2025 9:25:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
100,001 cubic yards or more $1,500 base fee plus $250 for each 100,000 <br /> cubic yards <br /> Other Miscellaneous Public Works Fees <br /> Load limit waiver (must be authorized by the <br /> Public Works Director) $175 per trip <br /> Call-out rate per visit (minimum 2 hours) plus <br /> Call-out charge for contractor negligence (lack of cost(s)* of any materials required to remedy the <br /> maintenance, traffic signs, and the like) issue. *TBD by the Director of Public <br /> Works/Parks and Recreation <br /> Water tower telecommunications maintenance No charge if during normal business hours, <br /> or repair access fee otherwise 2 hour minimum charge for each after <br /> hours call-out <br /> Water tower telecommunications plan review Actual legal and consulting engineering costs <br /> and inspections plus $200 for administration costs and $2,500 <br /> escrow. <br /> RPZ annual inspection violation See property based violations, Section IV, <br /> Police/Administrative Offenses <br /> Appeal of public improvement bond $250 (M.S. § 429.036) <br />
The URL can be used to link to this page
Your browser does not support the video tag.