My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-04-23 WS, LBAE, & CC Packet
Centerville
>
City Council
>
Agenda Packets
>
2026
>
2026-04-23 WS, LBAE, & CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2026 1:53:06 PM
Creation date
4/17/2026 4:12:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2026 Assessment Summary <br />The 2026 preliminary assessment for the City of Centerville has been completed in accordance <br />with Minnesota state statutes, Minnesota Department of Revenue and Anoka County <br />guidelines. <br />The 2026 assessment for the City of Centerville is based on 1,664 parcels of property within the <br />city. The assessing staff physically inspected 260 properties during the quintile review process <br />and 71 properties where building permits were issued for improvements, remodeling, or <br />demolition projects during the year. <br />There were 65 total sales recorded in the 2026 assessment study period, which is October 1 st, <br />2024, through September 30, 2025. Of the 65 sales, 60 were residential classification and 7 were <br />commercial or industrial classification. There were 40 residential sales that met the criteria as <br />"qualified sales", according to the MN Department of Revenue. Those sales were the basis for <br />adjustments made to the improved residential properties throughout the city. There was one <br />commercial sale that was "qualified". Given the lack of sales of commercial, industrial and <br />apartment sales in Centerville, those valuations were guided by overall County trends, with <br />local adjustments made as appropriate. The sales summary list is at the end of this report, <br />which shows the reason codes for a sale being "unqualified" and a count for each reason <br />code from this sales study period. <br />The preliminary total estimated market value (EMV) is $712,036,400. The total new construction <br />valuation for the year was $4,040,600. After subtracting out the new construction amount, the <br />overall city value is $707,995,800, a 1.26% decrease from last year. <br />The chart below illustrates changes in the total estimated market value of the City of <br />Centerville for 2018 through 2026. <br />CITY OF CENTERVILLE TOTAL ESTIMATED MARKETVALUE 2018-2026 <br />$704,174,300 $717,031,100 <br />$707,995,800 <br />$613,400,300 $657,173,300 <br />$485,499,100 <br />$471,384,400 <br />$411,089,500 $447,370,800 <br />2018 2019 2020 2021 2022 2023 2024 2025 2026. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.