My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-05-05 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
2026
>
2026-05-05 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 1:37:00 PM
Creation date
5/1/2026 1:36:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec Consulting Services Inc. <br />733 Marquette Avenue, Suite 1000 <br />MinneapolisMN55402-2314 <br />March 25, 2026 <br />Athanasia Lewis Î City Administrator <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br />Dear Ms. Lewis, <br />Reference: Site Plan Review and Conditional Use PermitÎ Sutton Transportation Expansion <br />We have reviewed the site plan dated December 12, 2025 and received March 6, 2026 for the proposed <br />st <br />building and parking lot expansion for the Sutton Transport facility located at 6855 21 Avenue South. The <br />following are our initial engineering comments for the proposed expansion: <br />Comments <br />General <br />1. It does not appear that the proposed improvements will impact traffic on the adjacent city streets. If <br />this were to change, the applicant shall prepare a Traffic Control Plan and obtain City approval prior <br />to any impacts to local roadways. <br />2. Final approval by the Rice Creek Watershed District must be attained before any site grading or <br />activity may commence. <br />Erosion Control/SWPPP <br />1. Compliance with the SWPPP shall be required for construction. Application shall submit a copy of <br />the NPDES Construction permit to the City prior to the start of construction activities. <br />Site Plan <br />1. The plans should clarify where the standard duty and heavy duty bituminous pavement sections <br />shall be used. <br />2. Applicant shall confirm that the proposed concrete pavement section matches the existing concrete <br />pavement section. <br />35 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.