My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-10-11 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-10-11 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2006 10:43:24 AM
Creation date
10/10/2006 10:42:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Anoka County Contract No.2006-0558 <br /> <br />WHEREAS, the parties agree that any extra work performed beyond that shown in th lans as <br />bid shall be the responsibility of the requested party; and, <br /> <br /> <br />WHEREAS, the parties agree that it is in. their best interest that the cost of said shared; <br />and, <br /> <br />WHEREAS, Minnesota Statute 471.59 authorizes political subdivisio <br />joint powers agreements for the joint exercise of powers common t <br /> <br />NOW, THEREFORE, IT IS MUTUALLY STIPULATED <br /> <br />I. PURPOSE <br /> <br />The parties have joined together for the <br />trail/concrete sidewalk, streetscape, drainage, <br />portions of County State Aid Highway No. <br />specifications numbered S.P. 02-614-24 on <br />Department (hereinafter collective rred t <br /> <br />, bituminous <br />utilities on <br />e plans and <br />ty Highway <br /> <br />II. <br /> <br />contracted, the cost of all labor, <br />required to complete the work, shall <br />referred to herein. "Estimated" costs are <br />incurred for the Project. Actual costs may vary <br />t parties will be responsible. <br /> <br />e project (including County furnished materials) is <br />e for the Project are capped at $6,523,550.00. The <br />d e ratio of eligible cost incurred by each party to the total <br />osts are the costs of items that can participate in federal funding <br />ation in the construction costs is as follows: <br /> <br />The City shall pay one hundred percent (100%) of the hydrant and curb <br />box relocation and gate box adjustment as well as water and sewer <br />relocation and construction. The estimated City cost of these items is <br />$397,050.00. <br /> <br />2 <br /> <br />Deleted: The City shall provide <br />constmction observation for the <br />relocation and reconstruction of their <br />utilities and approve for acceptance the <br />work as it is <br /> <br />Formatted: Bullets and <br />
The URL can be used to link to this page
Your browser does not support the video tag.