My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-10-11 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-10-11 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2006 10:43:24 AM
Creation date
10/10/2006 10:42:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Anoka County Contract No.2006-0558 <br /> <br />L--The City shall furnish and deliver to the construction site replacement <br />hydrants for any hydrants, which are being relocated as a pa of this <br />project, which they want replaced. <br /> <br /> <br />1-- The City shall provide construction observation for t <br />reconstruction of their utilities and approve for accept <br />completed. <br /> <br />,Ja. The City shall be responsible for any detk <br />----------------- <br />relocation and reconstruction of the utilities th <br />completion of the Project but retains its right <br />contractor or subcontractor for lleolioence mi <br />malfeasance. or any issue arisino outs'. e of a <br /> <br />participating. <br />a percentage <br />torm sewer <br />, manholes, <br />ponds and <br />d a portion <br />fined in the <br /> <br />t ~et:'Ye~ lhe_ Ci!y ~n~ C...9u.!lty_ <br />by the product of contributing <br />tage of contributing flow from <br />al eligible estimated cost of the <br />estimated cost to the City is <br /> <br />imated cost of the storm sewer is $0.00 of which <br />0.00 (100%). <br /> <br />fly percent (50%) of the cost of concrete curb and. <br />n curb and gutter) in Centerville. The estimated total <br />urb d gutter including medians is $281,114.00, of which the <br />imated cost is $115,222.00. <br /> <br />Th lty shall pay one hundred percent (100%) of the cost of decorative <br />median above the cost of concrete median. The City's estimated cost for <br />decorative median is $0.00. <br /> <br />The City shall pay one hundred percent (100%) of the cost of streetscape <br />items including but not limited to: median plantings, trees, tree grates, <br />street lights, stamped concrete and other aesthetic treatments the City <br /> <br />3 <br /> <br />Deleted: 4 <br /> <br />,......._.....__.______________________________mm...mmm...............___________________.__.__m.... <br />-l Formatted: Bullets and Numbering <br /> <br />Deleted: 5 <br /> <br />Deleted: 5 <br /> <br />Deleted: 5 <br /> <br />Formatted: Bullets and <br />
The URL can be used to link to this page
Your browser does not support the video tag.