Laserfiche WebLink
<br />Anoka County Contract NO.2006-0558 <br /> <br /> <br />~As the City of Centerville has a population of less than 5000 <br />City shall pay zero percent (0%) of the cost of co <br />installation of the whole traffic actuated signal syst <br />(including County supplied materials). <br /> <br />~The County shall pay one hundred percent <br />costs. <br /> <br />~ The City shall pay one hundred perc <br />Pre-emption (EVP) costs. The City' <br />(Not in cost estimate at this time) <br /> <br />1L- The City shall pay their s <br />non-participating items, <br />$35.750.00, <br /> <br />atina <br /> <br />Construction <br />Utilities <br />2 Grading, B <br />3 Storm S <br />4 Dete <br />Sewe <br />5 Conc <br />6 Deco <br />7 S tree <br />8 Driv <br />9 Conc <br />10 Trail <br />11 Stree <br />12 Traffi <br />13 EVP <br />14 Mobi <br />15 Traf <br />Total <br />Cost <br />Esti <br />City <br />Total <br />Total <br /> <br />.25 <br />484,777.50 <br />$0.00 <br />$0.00 <br />$0.00 <br />$}5-J5.!ULO.. <br />$4.750.00 <br />Construction $,J,JjtJ.ll-,iZ_ <br /> <br />al Funds available to the$.714.693:40 <br /> <br />$.1.436:834.07 <br />$.1,436,834.07 <br /> <br />s Federal Funds <br />nstruction Cost to City <br /> <br />5 <br /> <br />/ Deleted: The City shall pay one <br />hundred percent (100%) of the cost of <br />any street lighting included in the project. <br />The design and installation of ornamental <br />streetlights shall be in accordance with <br />the County's specifications. The City's <br />estimated cost for street lighting is $ <br />0.00. <br /> <br />Formatted: Bullets and <br /> <br />Deleted: as detennined <br /> <br />Deleted: 85,800.00 <br /> <br />,) Deleted: as detennined by Mn/DOT <br /> <br />IS <br /> <br />..~ Deleted: 6,345.00 <br /> <br />Deleted: 85,800.00 <br />Deleted: 11,400.00 <br />Deleted: 2,245,352.47 <br /> <br />Deleted: 759,985.20 <br /> <br />: Deleted: 1,485,367.27 <br /> <br />Deleted: 1,485,367.27 <br />