Laserfiche WebLink
<br />Anoka County Contract No.2006-0558 <br /> <br /> <br />The total estimated construction cost to the City (less Federal Funds) for the <br />$.,ldlgJni.Ol a~ s.ho~n -,?n Jh~ a!!.acJ1e~ E.~hj!:>i~, 1\ a,!d !:3. ],h.~ ~it),P'!l1i~ip~ti~n . <br />engineering will be at a rate of eight percent (8%) of their designated share. <br />to the City for construction engineering is $172_122.20~m The grand total <br />cost to the City for the Project is $ $1 ,608.956.27~ _ _ _ _ _ _ _ <br /> <br />Upon final completion of the project, <br />based upon actual construction costs. If neces <br />(95%) charged will be made in the form of cre <br />the remaining five percent (5%) of the City's p <br /> <br />cost will be <br />five percent <br />share. Also, <br />paid. <br /> <br />B. Design <br /> <br />The City shall be r <br />requested following the a <br />changes/additions have be <br /> <br />of CSAH 14 using a rural <br />ide ofCSAH 54. The City's <br /> <br />hem Lights Blvd south of <br />r this design is $5,200.00 <br /> <br />The City's <br /> <br />computations to relocate two ponds on north <br />perty) to south side ofCSAH 14. The design cost <br />Ich the City's cost is $0.00. <br /> <br />County, <br />18,550.0 <br />engineer' <br /> <br />tract, the City shall pay to the County, upon written demand by the <br />rce (100%) of its portion of the design cost of the project estimated at $ <br />ty's share of the design cost of the project shall include only design <br />e and does not include administrative expenses incurred by the County. <br /> <br />6 <br /> <br />Deleted: 1,485,367.27 <br /> <br />--' Deleted: 179,628.20 <br />." Deleted: 1,664,995.47 <br /> <br />Deleted: five <br />Deleted: 9 5 <br />Deleted: 1,581,745.69 <br />