Laserfiche WebLink
<br />Saint Paul Audubon Society P.O. Box 7275, St. Paul, MN 55107 Holly Peirson, 2003 President <br />651-464-6743 www.saintpaulaudubon.org <br /> <br />Bikeways and Trailways group from Shoreview, 4600 Victoria Street North, Shoreview, MN <br />55126, James Mulholland Chairman <br /> <br />Local groups: <br /> <br />Boy Scouts, Girl Scouts, YMCA, Community summer program participants <br /> <br />Rice Creek Chain of Lakes Preserve park users. See also: <br /> <br />Residents of Centerville, Lino Lakes, Hugo, Shoreview, White Bear Lake, Vadnais Heights, <br />Columbus Township, Forest Lake and other metro and state residents. <br /> <br />3 Costs Associated with the Project <br /> <br />. Provide a list with estimated costs to provide justification for the total project cost and grant <br />request. <br />. Include materials, landscaping, design! engineering services, contractor services, signage, <br />etc. <br /> <br />Clearwater Trail Desired Route Cost Estimates (Also see Fig 2) <br /> <br />$ 68,000 <br />$ 50,000 <br />$ 3,000 <br />$ 1,400 <br /> <br />Class 5 and asphalt 10 feet wide (4,000 feet of trail at $17.00 per foot) <br /> <br />Land acquisition estimate <br /> <br />Trail signage (estimate is 30 signs at $100 each) <br /> <br />Trail benches made of recycled materials (estimate 4 at $350) (Fig 5) <br /> <br />$ 1.000 <br /> <br />Landscaping <br /> <br />$ 123,400 <br /> <br />Total (This assumes MnDOT would cover the cost of the pedestrian bridge.) <br /> <br />9 <br />