My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-12-06 P&R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2006
>
2006-12-06 P&R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2007 9:40:18 AM
Creation date
12/5/2006 1:52:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Clearwater Trail Alternate Route Cost Estimates (Also see Fig 2) <br /> <br />$ 136,000 <br />$ 50,000 <br />$ 3,000 <br />$ 1,400 <br /> <br />Class 5 and asphalt 10 feet wide (8,000 feet of trail at $17.00 per foot) <br /> <br />Land acquisition <br /> <br />Trail signage (estimate is 30 signs at $100 each) <br /> <br />Trail benches made of recycled materials (estimate 4 at $350) (Fig 5) <br /> <br />$ 1.000 <br /> <br />Landscaping <br /> <br />$ 191,400 <br /> <br />Total <br /> <br /> <br />Figure 5. Trail bench on the east end of the Rice Creek Chain of Lakes Trail <br /> <br />The bench in Figure 5 is west of Centerville Road on the existing Rice Creek Chain of Lakes <br />trail that would connect with the Clearwater Trail. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.