Laserfiche WebLink
<br />NOV-29-2006 16:54 <br /> <br />MI', Mlclrae/ arocha/a <br />November 21, 1006 <br />Pag/J1 <br /> <br />4. Improvements to CSAH 54 also include the dedication of right-of-way along the <br />length of the development property (approx. 1 mile) and ponding/drainage <br />easements to accommodate the CSAH 54 improvements. <br /> <br />5. Modification of the proposed CSAH 14/21S( Avenue % intersection to a "Limited <br />Access" configuration that includes signalization and left outs from southbound <br />2151 Avenue to CSAH 14. The south leg of215t Avenue will remain as a right- <br />in/right-out as currently proposed. The cost of the changes to the intersection <br />including signalization will be the responsibility of the developer. <br /> <br />6. The development will be contributing fmancially to the reconstmction of the <br />CSAH 14/35E Interchange. <br /> <br />With the implementation of these improvements the County can support the new signal as <br />indicated in Item #5 above. <br /> <br />We look forward to continuing to work on this development with the City. If you have any <br />questions, please feel free to let me know. <br /> <br /> <br />DOll as W. Fischer, PE <br />County Engineer <br /> <br />DF/sh <br /> <br />P.03/03 <br /> <br />~ <br /> <br />TOTAL P. 03 <br />