My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-12-27 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-12-27 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2006 7:59:42 AM
Creation date
12/22/2006 12:54:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Anoka County Contract No.2006-0SS8 <br /> <br />2. The City shall furnish and deliver to the construction site replacement <br />hydrants for any hydrants, which are being relocated as a part of this <br />project, which they want replaced. <br /> <br />3. The City shall provide construction observation for the relocation and <br />reconstruction of their utilities and approve for acceptance the work <br />whenever it is completed. <br /> <br />3a The City shall be responsible for any deficiencies associated with the <br />relocation and reconstruction of the utilities that arise during or after the <br />completion of the Project but retains its right to take recourse against any <br />contractor or subcontractor for negligence, mistake, misrepresentation, <br />fraud, malfeasance, or any issue arising outside of a contractor's <br />warrantee. <br /> <br />4. The City shall pay one hundred percent (100%) for the non-participating <br />and non-eligible portion of the storm sewer construction plus a percentage <br />of the eligible portion of storm sewer construction. Storm sewer <br />construction includes pipes, aprons, trash guards, catch basins, manholes, <br />castings, rip rap, inlet protection, detention basins (including ponds and <br />their outlet structures and grit chambers and/or collectors), and a portion <br />of mobilization. The non-eligible and eligible portions are defined in the <br />State Hydraulics letter. <br /> <br />4a The estimated cost of the non-participating storm sewer is $0.00 of which <br />the estimated cost to the City is $ 0.00 (100%). <br /> <br />4b. The cost of the eligible portion will be split between the City and County <br />based on the ratio of contributing flow determined by the product of <br />contributing area and runoff coefficient. The estimated percentage of <br />contributing flow from the City is Thirty Eight percent (38%). The total <br />eligible estimated cost of the storm sewer is $1,439,844.00 of which the <br />estimated share to the City using the standard County cost share policy is <br />$547,140.72. The County shall credit the City $547,140.72 for this project <br />for providing storm water ponding solutions for the project. The total <br />estimated cost of storm sewer and detention basins (including ponds and <br />their outlet structures and grit chambers and/or collectors) to the City is <br />$0.00. <br /> <br />4c. The total non-eligible estimated cost of the storm sewer is $0.00 of which <br />the estimated cost to the City is $0.00 (100%). <br /> <br />5. The City shall pay fifty percent (50%) of the cost of concrete curb and <br />gutter (less median curb and gutter) in Centerville. The estimated total <br />cost of curb and gutter including medians is $281,114.00, of which the <br />City's estimated cost is $115,222.00. <br /> <br />6. The City shall pay one hundred percent (100%) of the cost of decorative <br />median above the cost of concrete median. The City's estimated cost for <br />decorative median is $0.00. <br /> <br />3 <br /> <br />/.5d <br />
The URL can be used to link to this page
Your browser does not support the video tag.