Laserfiche WebLink
<br />1. INTRODUCTION <br /> <br />On April 23, 1997, the City of Centerville authorized MSA, Consulting Engineers to <br />prepare a cost analysis for extending watermain along Peltier Lake Drive from Mill Road <br />to Centerville Road, including reconstruction of the street and storm sewer systems. A <br />watermain extension along Centerville Road would also be constructed. <br /> <br />2. PROJECT SCOPE <br /> <br />The scope of the project consists of providing City water connection to residents along <br />Peltier Lake Drive and Centerville Road, as well as to homes in the Lakeland Hills <br />development to the south. This watermain extension would also provide a connection <br />point for a future watermain extension along the remainder of Peltier Lake Drive west to <br />County Road 14. <br /> <br />These watermain improvements will benefit residents along the alignment by providing <br />them with City water service. Residents will also benefit from increased fire protection, <br />as fire hydrants would be provided along the watermain extension. <br /> <br />This watermain project would also justify the reconstruction of Peltier Lake Drive, which <br />is in need of repair and storm sewer improvements. <br /> <br />3. PROPOSED IMPROVEMENTS <br /> <br />The proposed improvements include extending watermain along Peltier Lake Drive from <br />Mill Road to Centerville Road, and from Peltier Lake Drive south along Centerville Road, <br />into the Lakeland Hills development. Peltier Lake Drive would also be reconstructed at <br />this time. This proposed watermain would allow for future extension of watermain along <br />the remainder of Peltier Lake Drive from Centerville Road west to County Road 14, and <br />then along County Road 14 to the existing 12-inch main along Main Street. This would <br />provide a looped water system for the western residential areas of the City. <br /> <br />An 8-inch watermain will connect to an existing 8-inch stub at the intersection of Peltier <br />Lake Drive and Mill Road. The watermain will be constructed along the north side of the <br />street, as an 18-inch steel casing was installed under the double box culverts for future <br />watermain extensions during the reconstruction of the Clearwater Creek crossing of Peltier <br />Lake Drive. An 8-inch watermain will then extend from Peltier Lake Drive along <br />Centerville Road, on the east side, where it will connect to the 8-inch watermain which <br />will extend through the Lakeland Hills development. An 8-inch stub will also extend from <br />Peltier Lake Drive north along the east side of Centerville Road to the north intersection <br />of Peltier Lake Drive and Centerville Road. This will provide a connection point for a <br />future watermain extension along Peltier Lake Drive west to County Road 14. <br /> <br />During the watermain construction, Peltier Lake Drive will be reconstructed. The street <br />will be reconstructed with a 7-ton section, which will consist of a 32-foot wide street with <br />concrete curb and gutter. The street will be constructed with a 3-inch bituminous surface <br /> <br />260/090-1404.may <br /> <br />-1- <br /> <br />260-090-10 <br />