<br />over a 6-inch Class 5 base. A 2-foot sub-base with draintile will need to be provided <br />under the road for proper support and drainage, as the area has poor soils which do not <br />drain well naturally. <br /> <br />Centerville Road will not be reconstructed curb to curb during the watermain extension, <br />as the road is in good condition. The bituminous surface will be removed and replaced <br />from the east curb line to the road centerline to allow construction of the waterrnain. <br /> <br />All residents along the watermain extension will be provided with a water service. The <br />water service will extend from the waterrnain to the property line, where a curb stop will <br />be installed. Each resident will be responsible for hook-up to City water from their home <br />to the curb stop. All water services will be open- cut to the property lines except the water <br />services along the west side of Centerville Road. These services will be jack bored under <br />the road surface not removed along the west side during the watermain construction. This <br />will minimize the disruption to the remaining portion of the street. <br /> <br />A sidewalk along the south side of Peltier Lake Drive and the east side of Centerville Road <br />would also be constructed as part of this project, where it would connect to the sidewalk <br />in the Lakeland Hills Development. The sidewalk within the Lakeland Hills Development <br />then connects to a bituminous trail between Lakeland Circle and the school playground. <br /> <br />4. EASElVIENTS AND PERMITS <br /> <br />All construction would be within the City street right-of-way; therefore, additional <br />easements will not be necessary. Some temporary construction easements may be needed <br />from property owners along the proposed construction alignment. <br /> <br />The permits which will be needed for the project are listed below. <br /> <br />\I <br /> <br />Minnesota Department of Health <br />Rice Creek Watershed District <br />MnDNR <br /> <br />Waterrnain Construction <br />Stormwater Discharge to Clearwater Creek <br />Protected Waters Permit <br /> <br />.. <br /> <br />II <br /> <br />5. ESTIMATED PROJECT COSTS <br /> <br />A total project cost has been estimated and is included in Table 1 or the Appendix. A <br />complete breakdown of costs for the project is also provided in Table 1. <br /> <br />The costs shown in Table 1 include all costs associated with the watermain extension along <br />Peltier Lake Drive. These costs include watermain construction, reconstruction of Peltier <br />Lake Drive, and restoration of Centerville Road. The total project cost includes a 38 % <br />overhead for engineering, administration, inspection, staking, legal fees, and <br />contingencies. <br /> <br />260/090-1404.may <br /> <br />-2- <br /> <br />260-090-10 <br />