Laserfiche WebLink
<br />TABLE 1 <br /> <br />Continued <br /> <br /> <br /> SCHEDULE - 5.0 PEL TiER LAKE DRIVE STORM SEWER <br />1 REMOVE RCP PIPE LF 735 10.00 7350.00 <br />2 REMOVE STORM SEWER STRUCTURE EA 8 150.00 1200.00 <br />3 15" CLASS III RCP LF 70 28.00 1960.00 <br />4 18" CLASS III RCP LF 85 32.00 2720.00 <br />5 21" CLASS III RCP LF 385 36.00 13860.00 <br />6 24" CLASS III RCP LF 230 40.00 9200.00 <br />7 30" FES EA 1 400.00 400.00 <br />8 24" X 36" CATCHBASIN EA 2 900.00 1800.00 <br />9 48" STORM MANHOLE EA 6 1200.00 7200.00 <br />10 STORMCEPTOR MANHOLE EA 2 11500.00 23000.00 <br />11 IN-PLACE DENSITY TEST EA 8 40.00 320.00 <br />12 PROCTOR TEST EA 1 85.00 85.00 <br />T SCHEDULE - 5.0 TOTAL $ 69,095.00 <br /> SCHEDULE - 6.0 PEL TIER LAKE DRIVE SIDEWALK <br /> 4" CONCRETE SIDEWALK SF 7110 3.00 21330.00 <br />T SCHEDULE - 6.0 TOTAL $ 21,330.00 <br /> SCHEDULE - 7.0 CENTERVILLE ROAD SIDEWALK <br />1 4" CONCRETE SIDEWALK SF 3330 3.00 9990.00 <br />T SCHEDULE -7.0 TOTAL $ 9,990.00 <br />