Laserfiche WebLink
<br />TABLE 1 <br /> <br />Continued <br /> <br />PROJECT COST SUMMARY <br /> <br />CONSTRUCTION COST <br /> <br />1.0 Peltier Lake Drive Street Work <br />2.0 Centerville Road Street Work <br />3.0 Peltier Lake Drive Watermain <br />4.0 Centerville Road Watermain <br />5.0 Peltier Lake Drive Storm Sewer <br />6.0 Peltier Lake Drive Sidewalk <br />7.0 Centerville Road Sidewalk <br /> <br />178631.00 <br />12370.00 <br />47970.00 <br />33660.00 <br />69095.00 <br />21330.00 <br />9990.00 <br /> <br />T TOTAL CONSTRUCTION COST <br /> <br />$ 373,046.00 <br /> <br />TOTAL PROJECT COST -- INCLUDES 38% OVERHEAD <br /> <br />1.0 Peltier Lake Drive Street Work <br />2.0 Centerville Road Street Work <br />3.0 Peltier Lake Drive Watermain <br />4.0 Centerville Road Watermain <br />5.0 Peltier Lake Drive Storm Sewer <br />6.0 Peltier Lake Drive Sidewalk <br />7.0 Centerville Road Sidewalk <br /> <br />246510.78 <br />17070.60 _ <br />66198.60 <br />46450.80 <br />95351.10 <br />29435.40 <br />13786.20 <br /> <br />. T TOTAL PROJECT COST <br /> <br />$ 514,803.48 <br />