Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />B~4 Response. We have planted trees and shrubs according to the approved landscape <br />plan. The area not planted is the 2 building lots and outlot A. We have put in more trees <br />than the approved plan. <br /> <br />The drainage plan has been followed with the retention pond and rain water garden. The <br />open drainage swale and retaining wall on the north end of the parking lot was changed to <br />a buried pipe. The change was approved by the city engineer. We also requested and <br />received approval to plant a row of spruce trees on the common boundary. In addition to <br />the drainage, the city public works parking lot storm water catch basin drains water into <br />the buried pipe which flows into our retention pond. Also the city water tower emergency <br />overflow discharge pipe is placed to allow flow into our drainage pond. We have given the <br />city permission to do so, since the pond has adequate capacity. <br /> <br />Item C Response. With the construction of the new building this development agreement <br />would be amended to fulfill the trail dedication, park dedication fees and adopt the new <br />landscaping and drainage plans. <br /> <br />Sincerel , <br /> <br />v;fii <br /> <br />aul Keleher <br />Chief Manager <br />Sedona T ownhomes, LLC <br />paul@SedonaTownhomes.com <br /> <br />~ <br /> <br />. <br /> <br />. <br />