Laserfiche WebLink
<br />~0/01/2B01 12:47 <br /> <br />5514il7501'3 <br /> <br />SOLID t3ROUND DEV <br /> <br />January 13, 2001 <br /> <br />Jim March. City Administrator <br />City of Csnterville <br />1880 Main Street <br />Cent~rville, MN 55038 <br /> <br />Re: Center Villa, Oversizing Costs <br /> <br />Dear Mr. March, <br /> <br />Per ou.r agreement, I have enclosed the contractors invoices <br />fo~ the above referenced project. The oversizing costs of <br />the watermain from an to 10" is the city's portion. <br /> <br />It breaks out as follows: <br />8" Watermain = $13.00/1f <br />10" Watermain "" $17.00/1f <br />Difference. $4.00/1f <br /> <br />8" Gate Valve. $67S.00/ea <br />10" Gate Valve ~ $965.00/ea <br />Differenoe . $290.00/8. <br /> <br />The following waS installed per attached invoice: <br />10u Watermain 1392 If x $4.CO = $5568.00 <br />10" Oate Valve 4 ea x $290.00 = $1160.00 <br />~otal City Cost ~ $6728.00 <br /> <br />Please let me know when we can expect payme~t fer these <br />items. <br /> <br />Sincerely, <br /> <br />Land Holding Group, Inc. <br /> <br />PAGE 02 <br />