My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-10-17 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2001
>
2001-10-17 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 9:19:32 AM
Creation date
1/19/2007 8:32:03 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10/01/2001 12:47 <br /> <br />651407601 9 <br /> <br />SOLID GROUND DEV <br /> <br />January 13, 200l <br /> <br />Jim March, City Administrator <br />City of C@nterville <br />1880 Main Street <br />Centerville, MN5s038 <br /> <br />Re: Center Villa, oversizing Coste <br /> <br />Dear rvrr. March I <br /> <br />Per our agreement, I have enclosed the contractors invoices <br />for. the above referenced project. The oversizing costs of <br />the watermain from a" to 10" is the city's portion. <br /> <br />It breaks out as follows: <br />an Watermain = $13.00/1f <br />10" Waterrnain ~ $17.00/1f <br />Difference s $4.00/1t <br /> <br />8" Gate Valve ~ $675.0D!ea <br />10" Gate Valve ... $~6S.o0!ea <br />Diffarenee = $290.00/ea <br /> <br />The tollowing waS installed per attached invoice; <br />10U Watermain 1392 If x $4.00 ~ $5568.00 <br />10" Gate Valve 4 ea x $290.00 ~ $1160.00 <br />~otal City Cost ~ $6728.00 <br /> <br />Please let me know when we can expect payment for these <br />items. <br /> <br />Since:::-ely, <br /> <br />Land Holding G~OUPI Inc. <br /> <br />Jeffrey Bock <br /> <br />Att.achments <br /> <br />0~f co?-( <br />\. <br /> <br />PAGE 02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.