My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-05-09 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-05-09 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 3:07:36 PM
Creation date
1/19/2007 3:07:06 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Centerville's portion of the total project cost, a scaled back project was <br />designed assuming that only the area within the 21 st Avenue right-of-way was <br />contributing runoff to the storm sewer system and the street construction <br />consisted of only 21 st Avenue. This design results in smaller storm sewer pipes <br />as well as a smaller pond and reduces the amount of street constructed. <br /> <br />Based on the estimated project costs for the scaled back design, the amount for <br />each community is computed as follows: <br /> <br />Total Street Cost <br />Total Storm Sewer Cost <br />Easement Acquisition - Pond <br />Subtotal <br />Contingencies (10%) <br />Estimated Construction Cost <br />Engineering, Legal, and Administration (30%) <br /> <br />$193,820.00 <br />$51,500.00 <br />$18,000.00 <br />$263,320.00 <br />$26.332.00 <br />$289,652.00 <br />$86,898.00 <br /> <br />Total Estimated Project Cost <br /> <br />$376,550.00 <br /> <br />Amount to be shared equally <br /> <br />$376,550.00 <br /> <br />Amount per City = $376,550.00/2 <br /> <br />$188,275.00 <br /> <br />4 <br /> <br />12292-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.