Laserfiche WebLink
<br />City of Centerville's portion of the total project cost, a scaled back project was <br />designed assuming that only the area within the 21 st Avenue right-of-way was <br />contributing runoff to the storm sewer system and the street construction <br />consisted of only 21 st Avenue. This design results in smaller storm sewer pipes <br />as well as a smaller pond and reduces the amount of street constructed. <br /> <br />Based on the estimated project costs for the scaled back design, the amount for <br />each community is computed as follows: <br /> <br />Total Street Cost <br />Total Storm Sewer Cost <br />Easement Acquisition - Pond <br />Subtotal <br />Contingencies (10%) <br />Estimated Construction Cost <br />Engineering, Legal, and Administration (30%) <br /> <br />$193,820.00 <br />$51,500.00 <br />$18,000.00 <br />$263,320.00 <br />$26.332.00 <br />$289,652.00 <br />$86,898.00 <br /> <br />Total Estimated Project Cost <br /> <br />$376,550.00 <br /> <br />Amount to be shared equally <br /> <br />$376,550.00 <br /> <br />Amount per City = $376,550.00/2 <br /> <br />$188,275.00 <br /> <br />4 <br /> <br />12292-01 <br />