Laserfiche WebLink
<br />A summary of total estimated construction and project costs is listed as follows: <br /> <br />Street <br />Storm Sewer <br />Easement Acquisition - Pond <br />Subtotal <br />Contingencies (10%) <br />Estimated Construction Cost <br />Engineering, Legal, and Administration (30%) <br /> <br />$267,300.00 <br />$68,350.00 <br />$55.000.00 <br />$390,650.00 <br />$39.065.00 <br />$429,715.00 <br />$128,915.00 <br /> <br />Total Estimated Project Cost <br /> <br />$558,630.00 <br /> <br />The additional cost to extend storm sewer to serve the Amoco site is $13,740.00. <br /> <br />The additional cost includes the extension of the storm sewer as well as over- <br />sizing the pipes downstream and increasing the size of the pond. <br /> <br />Right-of-Way and Easements <br /> <br />The roadway improvements along the 21 st Avenue corridor are to be located <br />within the 80' wide right-of-way, of which 40' is located in the City of Centerville <br />and 40' in the City of Lino Lakes. The roadway improvements along Northern <br />Lights Boulevard are to be located within the 60' wide right-ot-way. <br />The southern portion ot the storm sewer will be need to be in an easement that <br />the City of Centerville will obtain. <br /> <br />Permits <br /> <br />Permits will be required from governmental agencies as follows: <br /> <br />Construction Activity within the <br />CSAH 14 (Main Street) Right-of- <br />Way <br /> <br />Anoka County <br /> <br />Roadway and Utility <br />Construction <br /> <br />Rice Creek Watershed District <br /> <br />Financing <br /> <br />A copy of the Joint Powers Agreement for the construction of the street and <br />storm sewer is included in the Appendix of this report. This document indicates <br />these costs will be shared equally by the Cities of Centerville and Lino Lakes. <br /> <br />The City of Lino Lakes runoff contribution to the storm sewer system is larger <br />than that of the City of Centerville. The City of Lino Lakes is also constructing a <br />portion ot Northern Lights Boulevard as part of this project. To determine the <br /> <br />3 <br /> <br />12292-01 <br />