Laserfiche WebLink
<br />BONESTROO ROSENE ANDERLIK3 <br /> <br />11' 6516361311 <br /> <br />02/07/01 16: 16 l5l : 02/03 NO: 807 <br /> <br />, CITY OF Cl!NT!RV1LLE <br />LMO'n'I PARK <br />UTILITY SERVICE COSTS <br />PROJECT NO. '1 e.otn <br /> <br />NOTES: <br />Proposed concession stand for 3 softball fields <br />Would include sewer and water lervlce10r toilets. sinks. water fountain, hydrant, etc. <br />Also need power (underground) extended from LaMotte Drive to the building. Power for <br />lighting 3 fields, electricity In concession stand, &coreboard, lIt sign at entrance to parking <br />lot. power for Fete de Lac F.tival oech yeer. <br /> <br />COST ESTIMATE: <br /> <br />1. SANITARY $l!W!1t Se,.VICE" FROM Me!! LIFT STATION SIT! <br /> <br />ITEM <br />1 Connect to existing Manhole <br />2 6" PVC, soh. 40 <br />3 Std. 4' diameter Manhole <br />4 Seeding <br /> <br />UNIT QTY <br />EA 1 <br />LF 630 <br />EA 2 <br />AC 0.7 <br />Subtotai' <br />+ 10% contk'1genctea <br />TOTAL SANITARY <br /> <br />UNIT PRICE <br />5500.00 <br />$14.00 <br />$1 ,400.00 <br />'1 ,500.00 <br /> <br />2. WATER SERVICE - FROM EXISTING ,ft PVC IN THE PARK <br /> <br />TOTAL <br />$500.00 <br />$8,820.00 <br />$2,800.00 <br />$1.050.00 <br />$13,170.00 <br />1330.00 <br />$14,500.00 <br /> <br />-"iTEM <br />1 Connect to existing 6" PVC <br />:2 1 1/2- Copper <br />:3 1 1/2" Corporation Slop <br />4 1 1/2- Curb Stop & Box <br /> <br />UNIT OJ( <br />EA 1 <br />LF 150 <br />EA 1 <br />EA 1 <br />SubtOtal <br />+ 10% contlngw1Clea <br />TOTAL WATER <br /> <br />UNIT PRiCe TOTAL <br />~OO.OO $400.00 <br />'13.00 $1.950.00 <br />$100.00 5100.00 <br />$150,00 1150.00 <br />--"'- -"-$2,600.00 <br />260.00 <br />52.880.00 <br /> <br />3. LAMOTTE PARK. PARKING LOT IMPROVl!MENTS (R.vllltd 02102101) <br /> <br />ITEM <br />1 Subgr~e Preplration <br />2 Aggregate Base, Class 6, 1'Yz" thick <br />3 8612 Concrete Curb & Gutter <br />4 Adjust casting <br />5 Adjust$anit8ry Sewer Clean Out <br />8 Bituminous Base Course - 1~" thick <br />7 Bituminous Wear Course - 1 ~.. thick <br />a Bituminous Material for Tack Cost <br />9 Bituminous Trail, 10' wide <br />1 Q Sodding <br />11 4" Solid Line, White Paint <br />12 ?avemant MMsage, Handicap, Paint <br /> <br />UNIT QTY <br />SY 5400 <br />TN 500 <br />LF 925 <br />EA 2 <br />EA 2 <br />TN 475 <br />TN 415 <br />GL 300 <br />LF 125 <br />sy eoo <br />LF 3100 <br />EA 4 <br />Subtotal, <br />+ 10% cantingenelee <br />TOTAL PARkING LOT <br /> <br />UNIT PRice <br />SO.60 <br />$a.SO <br />$10.00 <br />$250.00 <br />$200.00 <br />536.00 <br />$37.00 <br />$1.50 <br />$15.00 <br />$3.00 <br />$0.30 <br />JSO.pO <br /> <br />TOTAL <br />$3.240.00 <br />$4.250.00 <br />$9,250.00 <br />$500.00 <br />5400.00 <br />$16,625.00 <br />$17.575.00 <br />$450.00 <br />$1,87!!5.CO <br />$1,500.00 <br />$930.00 <br />$200.00 <br />$56,795.00 <br />5,680.00 <br />$52,475.00 <br /> <br />21112001 ' <br /> <br />:;! <br /> <br />I'" <br />\ <br />\ <br /> <br />,I <br /> <br />::.. <br />" <br /> <br /> <br />:j:, <br />,:i:\ <br />