Laserfiche WebLink
<br />BONESTROO ROSENE ANDERLIK3 <br /> <br />iT 6516361311 <br /> <br />02/07/01 16:16 [)l :03/03 NO:8q7 <br /> <br />4, CONCISSION/RESTROOM BUILDING <br /> <br />iTEM <br />Complete Structure <br /> <br />UNIT <br />LS <br /> <br />OTV UNIT ~RICE TOTAL <br />1 S12e.OOO.OO $125,000.00 <br /> <br />,. F4L5SQTRIC POWER <br /> <br />Power QQmO./w <br />480/240V 1 Phase 600 amp 18I'\Iiee to ballfleld$icoOO&&slon <br />240(120V 1 Phese 400 amp Mrvlce to Park Building <br />lallfh,'dl <br />Ballfield Service Panel <br />Set Pole <br />Conduit & WIre <br />Misc. connectors/fittlngs <br />400 A Sili'\ll~ <br />Conduit & Wire <br />400 A Panel <br />Mount & Rewire Circuits <br />Miac. connectorsffittinQ$ <br /> <br />$8,000.00 <br />$4,000.00 <br /> <br />$32.000,00 <br />$500.00 <br />$9,600.00 <br />$1,100.00 <br /> <br />$3.400.00 <br />$3,900,00 <br />$2,000,00 <br />$730,00 <br /> <br />aOA 2-pole receptacles for carntval ($:250 each) <br />TOT At eLeCTRIC POWER <br /> <br />1 Sanitary Sewer <br />2 Waler Service <br />3 ParkIng Lot <br />4 Concession Bldg. <br />5 Electric <br /> <br />Total Constructlcn <br />+15% deeign,lnapectlon, Admin <br />TOTAL PROJECT <br /> <br />I.UMMMY <br /> <br />$1.500.00 <br />566,730.00 <br /> <br />$14.1500.00 <br />$2.660.00 <br />$62.475.00 <br />S 1215,000.00 <br />$6e.730;OO .. <br />$211.585.00 <br />$40,735.00 <br />$312.300.00 <br /> <br />. Does not inclllde poles and wiring for south and east fields, Add $75,000 for this work" <br /> <br />21712001 <br /> <br />[;: <br /> <br />'(I <br />!;; <br />.,. <br />(! <br /> <br /> <br />II <br /> <br /> <br /> <br />./) <br />.li <br />. ~j ! <br /> <br />