My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-11-08 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2000
>
2000-11-08 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2007 2:59:49 PM
Creation date
2/9/2007 12:24:07 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Northeast Metro Trail Plan (Draft) <br /> <br />October 4,2000 <br />Centerville Park and Recreation, 651-429-3232, <br />Wayne LeBlanc, 651-426-0168 <br /> <br />Centerville, Lino Lakes, Hugo, Anoka Parks, Anoka County, Washington County, Ramsey County, and the <br />surrounding Metro area benefit from the trail plan in Figure 1. The trails connect the Hugo trail that will eventually <br />go to Duluth to other trails connected to the Chain of Lakes Park and south to Otter Lake Park including a future <br />recreational park at Birch Street and Centerville Road. The trails in and around Centerville are designed to promote <br />safe pedestrian and bicycle routes to parks, commercial areas, other trails, homes, and places of interest. In addition, <br />loops in the design enhance flexibility and appeal. <br /> <br /> <br />The purpose of this plan is to <br />coordinate the participating <br />organizations. Please contact <br />Centerville or Wayne LeBlanc to <br />coordinate actions. <br /> <br />On Sep 25, 2000, people <br />representing Centerville, Hugo, Lino <br />Lakes, Anoka County Parks, St Paul <br />Water, and Washington County <br />Parks met and agreed to pursue this <br />plan. <br /> <br />Considerations for particular areas <br />are identified with the large letters <br />and described below. <br /> <br />Area A: HU2:o to Pedestrian <br />Brid2:e at 35E <br />Hugo, Washington County, Lino <br />Lakes, and Anoka County plan to <br />coordinate the route of a trail from <br />the existing Hugo trail to a proposed <br />pedestrian bridge at Area B, where <br />35E and Clearwater Creek intersect. <br />With Hugo's planned reconstruction <br />of the road from Area A to Hugo in <br />Figure 1. Trail Plan the next couple years, the inclusion <br />of the trail follows naturally. The <br />urgency here is to include the trail in the forthcoming reconstruction. Hugo is also looking at the potential of <br />providing an attractive trail along Clearwater Creek all the way to Bald Eagle Lake. <br /> <br />Area B: Pedestrian Brid2:e at 35E <br />Area B was chosen for a pedestrian bridge to cross 35E because there are plans in Hugo to provide a trail along <br />Clearwater Creek and because it would more easily accommodate pedestrian traffic than at the automobile intensive <br />freeway interchange at 35E and County Road 14 (Frenchman Road). The ur~ency here is to control development in <br />the surrounding area on both sides of the freeway now to provide a route for the pedestrian bridge. At the meeting., <br />everyone thought this appears feasible. There may also be a possibility to request funds for a pedestrian bridge in <br />2002. A small section ofland west of35E to 20th Ave needs to be coordinated by Lino Lakes, Centerville, and <br />Anoka County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.