My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-11-08 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2000
>
2000-11-08 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2007 2:59:49 PM
Creation date
2/9/2007 12:24:07 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Area C: Commercial Trail <br />Area C is within Centerville and is currently zoned commercial. A trail through this area will accommodate <br />pedestrians and bicycles and provide a route to either Main Street to the north or a route to parks to the west by <br />going through area J. <br /> <br />Area D: Main Street <br />Area D is Main Street, well traveled by automobiles, pedestrians, and bicycles. Pressure for a pedestrian route from <br />downtown Centerville to the developing commercial area by 35E will grow exponentially and something will need <br />to be done to protect pedestrians and cyclists. The Minnesota Design Team suggested a phased approach here with <br />areas marked off for pedestrians and bicycles in the interim, and complete separation from automobile traffic in the <br />future. If Main Street is redone, perhaps a trail could be included without affecting existing property owners. If one <br />side had to be chosen, the north side of Main Street appears better for a trail as there is vacant property, a strip mall, <br />and a convenience store on that side of the street. The one house that is close to the street on the north side will <br />likely become commercial. The ur~ency here is that commercial property is being developed along Main Street and <br />with proper planning. a separate trail could be built in sections as the developments were done. The current <br />supposed trail at the strip mall was not built to any specs and will have to be rebuilt. <br /> <br />Area E: "Sunset Park" Overlookinl! Centerville Lake <br />The Minnesota Design Team saw this area as the "Town Square" of Centerville. A park and pier on Centerville Lake <br />could coexist with a circular trail around Centerville Lake. The sketch in Figure 2 shows one idea. The trail <br />continuing around CentervilIe Lake also fits with the Anoka County Park plan. The urgency here is to acquire <br />property when it comes up for sale. <br /> <br /> <br />Figure 2. Area E, Main Street and Centerville Lake (Design Team Sketch) <br /> <br />2 <br /> <br />.....; '"' ..' <br />
The URL can be used to link to this page
Your browser does not support the video tag.