My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-14 Set Agenda
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-02-14 Set Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2007 2:12:53 PM
Creation date
2/15/2007 2:12:36 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Bonestroo 2006 Performance Review <br />An Evaluation of Services Provided by Bonestroo <br /> <br />Comments received from: Composite of Council and Staff <br />Date: January 31,2007 <br />Review consolidated by.: Dallas LarS<?n <br /> <br />· What have you liked best about our services? In other words, what would <br />you like to see us continue? <br /> <br />Thoroughly checking all work done by contractors for the City of <br />Centerville. Reviewing all significant changes with council Is helpful to <br />keep us on top of things. Evaluating all punch list Items. and ensuring that <br />all are being accomplished for the city. Written update by engineer has <br />been valuable to Council. <br /> <br />· What have you not liked or least valued ",bout our service? <br /> <br />Things are better with the change in Bonestroo staff member Involved with <br />Centervllle. It Is important that the engineer .Is working for the CIty's best <br />Interest at all times and is not afraid to approach and call out contractors <br />and service providers who may not have accomplished all that is needed <br />for a job. It is essential that contractors be held to the specifications and <br />that inspections be thorough. Projects should not be closed until all <br />. contract requirements are met. <br /> <br />· What ideas can you share with us to help us improve our service? <br /> <br />Continue to focus, not only engineering requirements, but customer and <br />client service aspects as well. Make sure that inspections staff is present <br />during critical stages.of project construction and that oversight is thorough. <br />enough to detect problems before they are buried. Two recent examples <br />where inspection fell short are the substandard fittings that caused the <br />recent watermain failure and.the Peltier Preserve sanitary sewer which was <br />not caught in the field or by reviewing the TV logs for the sewer. One of <br />these is a BRAA project and one appears to predate BRAA. . <br /> <br />/4-P <br />
The URL can be used to link to this page
Your browser does not support the video tag.