Laserfiche WebLink
<br />DRAFT <br /> <br />2/2312007 <br /> <br />EXHIBIT C <br /> <br />PLUMBING, MECHANICAL AND FIRE SUPRESSION PERMITS <br /> <br />1. Plumbing Permits <br /> <br />A. The charge shall be five dollars ($5.00) for each plumbing fixture, device or connection to the sewer or <br />plumbing system, with a minimum charge of twenty dollars (~ $29.50) <br /> <br />B. For any alteration, repair or extension to an existing plumbing system, where the work is of such a <br />natw'e that the permit fee charge cannot be determined from the above schedule, the permit fee shall be <br />thirty dollars ($30.00) first five-hundred dollars. ($500.00) or :fraction thereot: plus fifteen dollars <br />($15.00) for each additional five-hundred dollars ($500.00) or :fraction thereof of the total market value <br />of such alteration, repair or extension. <br /> <br />The charge for commercial, industrial or institutional building shall be: <br /> <br />Two percent (2%) of the total cost oflabor and materials of the heating, <br />ventilation and air conditioning work to be completed. <br /> <br />Work commenced without first obtaining a permit shall be charged an investigative fee equal to permit fees. <br />2. Mechanical Permits <br /> <br />The charge for a residential dwelling shall be twenty dollars (~ $29.50) for each of the following units but <br />not to exceed S199.99 $129.50: <br /> <br />. Main Gas Line Piping <br />. Gas Furnace <br />. Air conditioner <br />. Boiler <br />. Air Exchanger <br />. Gas Fireplace/Gas Log (Install in regular fireplace) <br />. Gas Boiler <br />. Gas Dryer <br />. Gas Stove/Range <br />. Wood Fireplace <br />. Duct Work <br />. Miscellaneous Mechanical Fixtures <br />. Gas Pool Heater <br />. Gas Wall Heater/Garage Heater <br /> <br />The charge for commercial, industrial or institutional building shall be: <br /> <br />Two percent (2%) of the total cost of labor and materials of the heating, <br />Ventilation and air conditioning work to be completed. <br /> <br />Work commenced without first obtaining a permit shall be charged an investigative fee <br />equal to permit fees, in addition to normal permit fees. . <br /> <br />Sprinkler /Fire Suppression system permits: <br /> <br />Single Family. Flat fee ofS400.00 <br /> <br />Other sprinkler/fire suppression permits. Contract cost of sprinkler/fire suppression system times <br />3.25% Qncludes plan review by Building Official and Fire Department). <br /> <br />Subject to State ofMN surcharge fees. <br /> <br />Page 9 of 14 <br /> <br />2-'/ <br />