My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-28 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-02-28 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2007 1:48:58 PM
Creation date
2/23/2007 3:34:19 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DRAFT <br /> <br />2/23/2007 <br /> <br />EXHIBIT D <br /> <br />ELECTRICAL FEES <br /> <br />Individual/separate inspection (installation, replacement, alteration or repair) ......~ $35.00 <br /> <br />Services, generators, feeders to separate structures and other power supply resources: <br /> <br />1. 0 ampere to and including 200 ampere capacity .............................................................$35.00 <br />2. Each additional 100 amps or fraction thereof .....................................................an add'l-$&OO $10.00 <br />3. For services and circuits operating at over 250 volts .................... (Scheduled fee doubles) <br /> <br />Circuits, feeders, feeder taps, or sets of transformer secondary conductors: <br /> <br />1. 0 ampere to and including 30 ampere capacity .................................................................$8.00 <br /> <br />2. 31 amps to 100 amps.......................................................................................................$10.00 ea. <br />3. Each additional I 00 amps .,_lll.............................................................an add'l $5.00 <br /> <br />.~~70~~~~::::~~d;:n~~~)....................................$150.00 <br /> <br />Multifamily dwellings, the first 29 YBits ~I..................................................................................~ $80.00 <br /> <br />R.emaiRiBgURi1s.............................................................................................................................$S9.00.~URit <br /> <br />Electrical supply for each manufactured home park lot ..............................................................................~ $40.00 <br /> <br />Recreational vehicle site, electrical s~ply equipment ................................................................................$10.00 ea. <br /> <br />Street, parking lot or outdoor area lighting standards ....................................................................................$5.00 <br /> <br />Transformers for light, heat and power: ............ ..................................... ............................... ...................... ..$8.99/UBit <br /> <br />Eaeh K\T ."a ........ ................................................. ........................ ...................................................... ..$.19 ea. <br /> <br />~ fee fer aay tfaBsf9flBeF .......................;.................. .................. .................................. ..$89 .99 <br />1. Up to and including 10 kilo-volt amps .....................................................................................$20.00 ea. <br /> <br />2. Over 10 kilo-volt amps. ................ ......... ............................. ...... ................ ..:............ .............. ...$40.00 ea. <br /> <br /> <br />Transformers and electronic power supplies. for electric signs and outline lighting..........................$+:99-l-. 599 "."a $7.50 <br /> <br />.. ...... .... ....................... ......... .................................................................................. $. 79 ell. .,\dd'l. 199 \T fa <br /> <br />Alarm, communication, remote control and signaling circuits or systems and circuits of less <br /> <br />than 50 volts ..............................................................................................................$ 19.99 fer 19 epeBiRgs $1.00 ea. <br /> <br />.......... ............................................................... ....... .................. .................... $S .99 ell. .""dd'l 19 epeBiRgs <br /> <br />Minimum fee......................................................................... ....... .................................................~ $35.00 <br /> <br />Swimming pool bonding inspection (each separate inspection) ..................................................................$25.00 <br />(Bonding conductors and connections require an inspection before being concealed) <br /> <br />Retrofit modifications to existing lighting :fixtures.................................... ............................. ....................... ..$.40/fixture <br /> <br />Electrical work commenced without filing the required permit ..................................................................$75.00 <br />or double the calculated <br />fee, whichever is greater <br /> <br />Re-Inspection fee (when inspection is necessary to determine whether the unsafe conditions have been corrected a fee <br />may be assessed in writing by the inspector) of ..........................................................................................~ $35.00 <br /> <br />When inspections scheduled by the installer are pre-empted, obstructed, prevented or otherwise not able to be completed <br />as scheduled due to circumstances beyond the control of the inspector, a supplemental inspection fee may be assessed in <br /> <br />writing by the inspector of.......................................... ........... ..................................................... .................~ $35.00 <br /> <br />Page 10 of14 <br /> <br />ff <br />
The URL can be used to link to this page
Your browser does not support the video tag.