Laserfiche WebLink
<br />March 19,2004 <br /> <br /> <br />Attn. Ted <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br /> <br />.MAR 2 2 2DfJ4 <br /> <br />Dear Ted: <br /> <br />Thank you for your continued interest in Sun Ramp products. Per our conversation this <br />afternoon, please find enclosed the additional materials you requested. <br /> <br />We do have all products in stock at this time and most orders are shipped in as little as <br />two-four weeks after we receive it. The Spine, Quarter-Pipe and Half-Pipe do require <br />some light assembly, mostly just bolting the panels and sections together and placing <br />the grind rails in position. Detailed instructions are provided with all shapes; the Spine <br />and Quarter-Pipe and assembly should take under an hour for each shape and the Half- <br />Pipe assembly time will depend on the number of adults and how pre-assembled it <br />comes to your location. <br /> <br />Our innovative ramps are designed so bikers, 'boarders and bladers can utilize present <br />facilities, with no needs beyond a paved or concrete surface-indoors or outdoors. <br /> <br />Sun Ramp can enhance your skate park with new and innovative obstacles for a fraction <br />of the cost of traditional ramp manufactures; with the added benefits of portability. <br />indoor/outdoor use and scientific weather resistant encapsulation. <br /> <br />Thanks again for your continued interest in Sun Ramp products. Contact us with any <br />further questions or concerns you may have. SunRamp looks forward to enhancing the <br />recreational needs of the City of Centerville. <br /> <br />Sincerely, ~ <br />~. <br />j~ wS1 <br />Terri Krause <br />Operations Manager <br />SunRamp Solutions, Inc. <br /> <br />SunRamp Solutions Inc. <br /> <br />4566 Abrahamson Road · Duluth, MN 55811 USA. 218-729-8249 . fax 218-729-8289 <br />toll-free 877-978-6726 · info@sunramp.com · www.5unramp.com <br />