Laserfiche WebLink
<br />Effective: 2/11/77 <br />City of Centerville Ord. #30 <br /> <br />thoroughly compacted with M.H.D Class 5 gravel base compacted to 100 <br />percent maximum density in 6 inch layers. The base shall be treated and a <br />surface installed in accordance with the Ordinances of the City of <br />Centerville and match existing road section. <br />· Unsatisfactory Filling Or Repair Of City Streets Or Right-Of-Way: <br />Where excavations are unsatisfactorily filled and or surfacing is <br />improperly patched, the City Council shall cause them to be placed in a <br />satisfactory condition and the cost thereof shall be charged to such <br />plumber doing further work within the City shall be suspended until such <br />charge is paid. Such plumber shall be given notice thereof and ten (10) <br />days within which to pay such charge. <br /> <br />SECTION 12. CONSTRUCTION REQUIREMENTS. <br /> <br />All building sewers and sewer service lines shall be of approved cast iron soil pipe, or plastic <br />pipe of a type approved by City Engineer. All joints or connections for approved pipes shall be <br />made in a manner and kind approved by City Engineer and kept on file with City Clerk. <br /> <br />Individual service lines shall not be less than four (4) inches in diameter and shall be placed at a <br />uniform grade not less than one-eighth (1/8) of an inch per foot. Building sewer lines shall <br />contain no more than two (2) ninety (90) degree long sweepbends or a combination of forty-five <br />(45) degree bends. A cleanout to the surface shall be provided between the first and second <br />ninety (90) degree bend. Each lend and cleanout riser and cover shall be of cast iron <br />construction or of type approved by City Engineer. Cleanouts shall be at intervals not to exceed <br />eighty one hundred (8G100) feet. No connecting sewer shall be laid parallel to any bearing wall <br />or footing unless further distant than three (3) feet from such bearing wall or footing. No <br />connecting sewer shall be laid within (20) feet of an existing well uDless cast iron soil pipe is <br />used. <br /> <br />Multiple connections of more than one (1) building shall not be made unless approved by City <br />Engineer. No inter-connection of existing private sewage system shall remain upon connection <br />to the public system. Upon completion of sewer service connection, a record made by Plumbing <br />Inspector showing placement of building sewer line and all outside cleanout risers as related to <br />building foundation and sewer service line shall be filed with City Clerk. <br /> <br />Old house sewers or portions thereof may be approved for use by the City Engineer. The City <br />Engineer may request that the old sewer be excavated for the purpose of facilitating inspection. <br />No house sewer shall be laid across or over any existing cesspool or septic tank unless the <br />existing cesspool or septic tank shall first be pumped clean and filled with earth to the existing <br />ground level. Where connecting sewer is laid, across or over the existing cesspool or septic tank. <br />All other cesspools or septic tanks shall be pumped clean and filled with earth to ground level <br />unless said tanks are required as portion of surface water drain system as approved by Plumbing <br />Inspector . <br /> <br />The sewer connection stub is marked by a two inch by two inch wood stake to the surface. The <br />sewer installer should verifY the location and elevation of the connection before proceeding with <br /> <br />Page 6 of9 <br />